My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2025-04-21
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 9:01:14 AM
Creation date
9/11/2023 3:22:20 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A CSWPPP WILL BE PREPARED BY THE CONTRACTOR PER THE <br />PROJECT SPECIFICATIONS <br />MR #2 Construction Stormwater Pollution Prevention <br />(SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br />(Construction SWPPP)is designed to be a stand-alone document that addresses construction stmmwater <br />management concerns. A copy of this SWPPP is required to be kept by the contractor performing the work at <br />the jobsite for reference and updated during the duration of construction. <br />Task 1: Describe the project during construction <br />(You may attach a narrative that answers the following questions) <br />Nature and purpose of the construction project: <br />The purpose of this project is to update the existing playground to better suit the needs <br />of the park. <br />Adjacent areas, including streams, lakes, wetlands, residential areas, and roads that might be <br />affected by the construction project: <br />No adjacent areas will be affected by the construction of this project. <br />How upstream drainage areas may affect the site: <br />The playground is currently located at a high point with no upstream waters entering <br />the playground area. <br />Downstream drainage leading from the site to a receiving body of water: <br />The project site will maintain the existing condition. Waters will infiltrate through the <br />artificial turf or runoff in a manner that matches the existing condition. This project dose <br />not anticipate any impacts to a Silver Lake. <br />Critical areas that receive runoff from the she up to one -quarter mile away: <br />There are no known critical areas downstream of the project site. <br />Special requirements and provisions for working near or within crhical areas: <br />WA <br />City of Everett Public Works <br />Smell Pmlect Stormwater Site Plan Report Dec 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.