Laserfiche WebLink
•Task 3: Attach Project Specific Stormwater Site Plan (required) <br />See City of Everett standard drawings #100-104 for slormwater site plan requirements and <br />examples, including a Temporary Erosion & Sediment Control (TESC) plan example and <br />drainage plan example, available online at: <br />everettwa gov/1531 /Design -Construct on -Standards <br />isTask 4: Attach Topographic Survey (required for some projects) <br />A topographic survey prepared by a registered land surveyor, civil engineer or other <br />qualified professional is required 1 your project site includes steep slopes, critical areas, <br />flood or geologic hazards or at the discretion of the stormwater reviewer. <br />isTask 5: Attach Declaration of Covenant and Grant of Easement <br />To ensure future maintenance and allow access for inspection, any On -Site Stormwmer <br />BMP (MR #5) constructed as pan of the project must have a Declaration of Covenant and <br />Grant of Easement. Fill out and attach the Declaration of Covenant and Grant of Easement. <br />For a copy, visit everettwa.aov/l985/Stormwater-Technical-Resources <br />)IMENT CONTROL PLANS. A SWEEP WILL BE PREPARED AND REFINED <br />THE CONTRACTOR PRIOR TO CONSTRUCTION. <br />4: N/A. THE PROJECT SITE DOES NOT INCLUDE STEEP SLOPES, <br />3AL AREAS, OR FLOOD OR GEOLOGIC HAZARDS. <br />5: NO INFRASTRUCTURE IS PROPOSED THAT REQUIRES A <br />ARATION OF COVENANT AND OR GRANT OF EASEMENT. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Mason Di 2019 <br />