My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton 9/8/2023
>
Contracts
>
6 Years Then Destroy
>
2023
>
Reid Middleton 9/8/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:08:51 PM
Creation date
9/12/2023 3:08:13 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton
Approval Date
9/8/2023
End Date
12/31/2023
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Condition Report for three existing Floats
Tracking Number
0003924
Total Compensation
$28,100.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Estimate of Professional Services <br />728 134th Street SW, Suite 200 PROJECT:BY:BGM Chkd by: KEL 8/25/23 <br />Everett, WA 98204 CLIENT:City of Everett Parks & Facilities DATE:8/24/2023 <br />(425) 741-3800 PROJ. NO:242023.913.026 <br />(425) 741-3900 FAX FILE:H:\24Wf\2023\913\026 City of Everett TA Sullivan Floats Assessment & Options\[2023 08 24 - TA Sullivan Park Floats Fee Estimate.xlsx]Std Rates <br />Principa <br />l <br />PM / Senior <br />Engineer <br />Senior <br />Designer <br />Design <br />Technician <br />Project <br />Administrato <br />r <br />Technical <br />Writer II <br />Total <br />Labor <br />hours <br />Total Labor <br />Earnings MileageLabor & <br />Reimb <br />Hourly Rate:$285 $196 $190 $158 $134 $152 $0.66 <br />Task <br /> No.Description JJS BGM DJO KL EHW <br />001 Kickoff & Team Meetings, Info Review <br />00101 Kickoff meeting (virtual meeting)1 1 1 3 671 671 <br />00102 Information review, dwgs, reports, codes & requirements, etc.2 2 4 772 772 <br />Subtotal Task 001 1 3 3 0 0 0 7 1,443 0 1,443 <br />002 Site Visit & Assessment <br />00201 Mobilization and Demobilization 4 4 8 1,544 1,544 <br />00202 Site Inspection 8 8 16 3,088 10 3,098 <br />Subtotal Task 002 0 12 12 0 0 0 24 4,632 10 4,642 <br />003 Draft Report & Concept Development <br />00301 Report incl. Concept Development 28 10 6 2 46 8,640 8,640 <br />00302 Opinions of Probable Construction Cost (Repairs, Options 1 & 2)16 16 3,040 3,040 <br />00303 Client Review Meeting 2 2 4 772 772 <br />00304 QA/QC 2 1 1 4 956 956 <br />Subtotal Task 003 2 31 29 6 0 2 70 13,408 0 13,408 <br />004 Final Report <br />00401 Final Report 4 4 2 1 11 2,012 2,012 <br />00402 Update Opinions of Probable Construction Cost (Repairs, Options 1 & 2)4 4 760 760 <br />00403 QA/QC 1 1 2 475 475 <br />Subtotal Task 004 1 4 9 2 0 1 17 3,247 0 3,247 <br />005 Project Management <br />00501 Initial Project Setup & Background Review - PM/PC 1 1 2 4 654 654 <br />00502 Site Visit & Assessment - PM/PC 1 1 2 386 386 <br />00503 Draft Report - PM/PC 1 1 190 190 <br />per mile <br />TA <br />Sullivan <br />WWA
The URL can be used to link to this page
Your browser does not support the video tag.