My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 1 of 28 <br /> <br />EXHIBIT A <br />SCOPE OF WORK <br /> <br />Background: <br />The EPIC Bridge project involves a Type, Size, and Location (TS&L) study for a new bridge <br />that will provide a new primary access to approximately 80 acres of AGENCY and privately- <br />owned property along the Snohomish River. The new access may involve significant impacts to <br />a community park-like amenity in the public Right of Way (R/W) and will span a Burlington <br />Northern Santa Fe (BNSF) Railway mainline and a two-lane roadway. The completed TS&L <br />study will be used to seek additional funding for full design and construction. <br /> <br />Project Objectives: <br />The City of Everett (AGENCY) has tasked the TranTech Engineering, LLC’s team <br />(CONSULTANT) to prepare a TS&L Report for the Everett Point Industrial Center (EPIC) Bridge <br />Project. <br /> <br />In addition, the AGENCY reserves the right to retain the services of the CONSULTANT, and its <br />team to advance the TS&L phase to full design level. All work performed by the CONSULTANT’s <br />team shall be per the Washington State Department of Transportation (WSDOT) Local Agency <br />Guidelines (LAG) Manual for federally funded projects. <br /> <br />The purpose of the TS&L Report is to provide enough background information so the <br />AGENCY can effectively evaluate the proposed final design and concept of the new bridge. <br /> <br /> Initial Scope Summary: <br />1. Project Management <br />2. Surveying <br />3. Geotechnical Engineering <br />4. Environmental Permitting <br />5. Civil Engineering <br />6. Utility Coordination and Design <br />7. Public Outreach <br />8. Architectural/Aesthetics Design <br />9. Traffic Control <br />10. Structural Design <br />11. Constructability Review, Construction Schedule & Estimation <br /> <br />Future Possible Scope (Optional Work) at AGENCY’s <br />discretion: <br />• Preliminary Engineering <br />• Design Engineering (PS&E) <br />• Construction Engineering <br /> <br /> <br />Project Standards: <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.