My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 2 of 28 <br /> <br />Reports and plans, to the extent feasible, shall be developed in accordance with the latest edition <br />and amendments of the following guidelines and documents: <br /> <br />• AASHTO LRFD Bridge Design Specifications <br />• AASHTO “A Policy of Geometric Design of Highways and Streets” <br />• AASHTO “Guide for the Development of Bicycle Facilities” <br />• Washington State Department of Transportation, “Bridge Design Manual” <br />• Washington State Department of Transportation, “Design Manual” <br />• Washington State Department of Transportation, “Highway Runoff Manual” <br />• Washington State Department of Transportation, “Materials Laboratory Outline” <br />• Washington State Department of Transportation, “Construction Manual” <br />• Washington State Department of Transportation, “Local Agency Guidelines” <br />• Washington State Department of Transportation, “Standard Specifications for Road and <br />Bridge Construction” <br />• Highway Research Board’s Manual entitled “Highway Capacity” <br />• CONSULTANT and Washington State Department of Transportation, “Manual on <br />Uniform Traffic Control Devices for Streets and Highways” <br />• Standard drawings prepared by AGENCY shall be used as a guide in all cases where they <br />fit design conditions. <br />• WSDOT Hydraulics Manual <br /> <br />Project Team: <br />The project team is composed of the following: <br /> <br />A. Owner – City of Everett Public Works (AGENCY) <br />B. Prime Consultant – TranTech Engineering, LLC (CONSULTANT) <br />C. Subconsultant – Perteet, Inc (Perteet) <br />D. Subconsultant – HWA Geosciences, Inc (HWA ) <br />E. Subconsultant – Kimley-Horn & Associates, Inc (Kimley-Horn) <br />F. Subconsultant – 1-Alliance Geomatics, LLC (1AG) <br />G. Subconsultant – LMN Architects (LMN) <br />H. Subconsultant – Ott-Sakai & Associates, LLC (Ott-Sakai) <br />I. Subconsultant – EnviroIssues (EnviroIssues) <br /> <br />The following work elements present a summary of the services associated with the PROJECT: <br /> <br /> <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.