My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 3 of 28 <br /> <br />WORK ELEMENT 1 PROJECT MANAGEMENT <br /> <br />This work element includes administration of the contract between TranTech Engineering <br />(CONSULTANT) and the AGENCY, preparation of monthly progress reports, and quality control, <br />necessary for the Project. The task includes all administrative services needed to coordinate with <br />the sub-consultant/s and to complete the Project on time and within budget. The following are the <br />categorized activities associated with this work element: <br /> <br />1.1 Monthly Progress Reports, and Invoicing: <br />• Progress reports will contain a narrative that identifies and describes significant <br />activities performed in the previous month and the significant planned activities for the <br />upcoming month. <br /> <br />1.2 Design Team Management: <br />• Schedule and coordinate with the design team. <br />• Prepare sub-consultant agreements as well as coordinate, budget, and review their <br />project progress and submittals. <br />• Prepare, monitor, and update the Project schedule. <br />• Monitor the Project budget. <br />• Prepare monthly billings, progress reports, and update monthly the Project schedule. <br />• Maintain regular informal contact through telephone discussions and electronic mail. <br />• Obtain, with assistance from the AGENCY, rights of entry necessary for geotechnical <br />studies, etc. <br /> <br />1.3 Meetings <br />• Weekly or biweekly meetings with AGENCY to coordinate and share progress. <br />• Biweekly meetings with internal team and including subconsultants when needed. Up <br />to twenty-four (24) team meetings are assumed for the duration of the design activities. <br /> <br />Deliverables: <br /> <br />• Progress Reports <br />• Meeting Minutes <br />• Monthly Invoicing <br />• Project Schedule <br /> <br /> <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.