My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 5 of 28 <br /> <br />Up to forty (40) wetland flags, set by others, are to be located. <br /> <br />2.4 Utility Surveying Services <br />• Surface Observable utilities will be located as found within the surveying limits. <br />• Measure Downs for sewer manholes, catch basins and storm drain manholes with pipe <br />size, material, direction, and invert elevations will be obtained, if possible, at each <br />structure. Nearest drainage structure outside the mapping limits will also be collected. <br />• A private underground utility locating firm will be sub-contracted for marking <br />underground conductible utilities. <br /> <br />2.5 Office Processing <br />This task includes the office processing of the collected survey data, data extraction, field <br />book note reductions, CADD drafting, and other duties required for the generation of the <br />deliverable(s). <br />For 3D laser scanning efforts, sub-tasks include the registering of point clouds; evaluating <br />the registrations; exporting the point cloud data to Civil3D; creating or picking of <br />appropriate points in Civil3D; Linework and Layering, and standard CADD drafting of the <br />deliverables, as required. <br /> <br /> <br />Deliverables: <br />• AutoCAD Civil 3D 2022 survey base map (electronic copy). (not to include terrain <br />model) <br />• AutoCAD Civil 3D 2022 terrain model, electronic copy. <br />• .XML terrain model. <br />• Signed pdf copy of the mapped areas, if required. <br />• Field book notes, if required. <br />• ASCII file of all topographic and control points, if required. <br />• An ASCII file with point numbers, coordinates, elevations, and descriptions for each <br />survey point, with benchmarks and survey control points clearly identified. <br />Assumptions: <br />• Health, Safety, and Security are priority. 1AG personnel will not proceed if the <br />conditions are deemed unhealthy, unsafe, or not secure from harm of any type. <br />• 1AG is not responsible for any delays due to conditions outside of 1AG’s control. <br />• Permits will not be required for 1AG’s efforts. <br />• Title Reports with underlying documents for the affected parcels to be provided by the <br />AGENCY. <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.