My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
# <br />Exhibit - Subconsultant Cost Computation <br />3.3831 <br />Principal IX Geotechnical Engineer VIIIGeotechnical Engineer VGeotechnical Engineer IIGeologist VIIIGeologist VIGeologist IIIContracts AdministratorAdministrative SupportCADTotal <br />Hours <br /> Direct Labor <br />Cost <br />Total Cost Per Work <br />Element <br />direct rate $93.00 $87.50 $58.50 $40.00 $85.00 $50.00 $39.00 $45.00 $33.00 $32.50 <br />Work Element 3.1 - Geotechnical Project Management 4,561.50$ 15,432.01$ <br />3.1.1 Attend Project Kickoff Meeting: 1 1 2 146.00$ <br />3.1.2 Project Coordination Meetings (Assume 12): 12 12 24 1,752.00$ <br />3.1.3 Invoice Generation and Processing: 6 6 12 621.00$ <br />3.1.4 Geotechnical Task Management: 20 5 25 2,042.50$ <br />0 -$ <br />Work Element 3.2 - Review Existing Geotechnical and Foundation Information 542.50$ 1,835.33$ <br />3.2.1 Collect and Review Available Geotechnical Data: 1 4 4 2 11 542.50$ <br />0 -$ <br />Work Element 3.3 - Geotechnical Field Explorations 6,555.00$ 22,176.22$ <br />3.3.1 Plan Field Exploration Program 2 4 4 10 569.00$ <br />3.3.2 Conduct Utility Locates for Geotechnical Explorations: 4 4 160.00$ <br />3.3.3 Second Utility Locates Site Visit: 3 3 120.00$ <br />3.3.4 Generate Geotechnical Work Plan Memo: 2 4 2 8 474.00$ <br />3.3.5 Conduct Phase 1 Explorations (Machine Drilled Geotechnical Borings): 8 50 58 2,468.00$ <br />3.3.6 Disposal of Investigation Derived Waste: 6 4 10 456.00$ <br />3.3.7 Conduct Phase 2 Explorations (Slope Reconnaissance): 10 10 20 790.00$ <br />3.3.8 Generate Boring logs and Assign Laboratory Testing: 4 8 4 4 20 1,050.00$ <br />3.3.9 Groundwater Monitoring: 4 6 10 468.00$ <br />City of Everett <br />Everett Point Industrial Center (EPIC) Bridge Project Project multiplier: <br />HWA GeoSciences, Inc <br /># <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.