My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
# <br />Exhibit - Subconsultant Cost Computation <br />3.0925 <br />Partner in ChargeProject ManagerSenior Urban DesignerUrban DesignerIntern ArchitectTotal <br />Hours <br /> Direct Labor <br />Cost <br />Total Cost Per <br />Work Element <br />direct rate 146.63 62.02 54.81 44.23 36.06 <br />Work Element 8.1 - Project Management and Administration 5,059.15$ 15,645.42$ <br />8.1.1 Monthly Progress Reports and Invoicing 24 24 1,488.48$ <br />8.1.2 Team Management and Coordination 3 4 6 12 25 1,547.59$ <br />8.1.3 Meetings 4 4 12 12 32 2,023.08$ <br />0 -$ <br />Work Element 8.2 - Existing data research 4,233.68$ 13,092.66$ <br />8.2.1 Review existing information 2 2 8 12 855.78$ <br />8.2.2 Collect and analyze regulatory parameters 1 8 9 585.11$ <br />8.2.3 Best practices for multimodal design 1 4 16 21 1,073.55$ <br />8.2.4 Research future plans 4 8 12 573.08$ <br />8.2.5 Analzye existing mobility networks 4 8 12 573.08$ <br />8.2.6 Parks and open space analysis 4 8 12 573.08$ <br />0 -$ <br />Work Element 8.3 - Topographic and site study 143.27$ 443.06$ <br />8.3.1 Review existing topographic information 0 0 1 2 3 143.27$ <br />8.3.2 Optional - Site visit to create LIDAR scan w. LMN equipment 0 0 0 0 0 -$ <br />8.3.3 Clean up LIDAR digital model 0 0 -$ <br />0 -$ <br />Work Element 8.4 - 3D model development 2,461.14$ 7,611.08$ <br />8.4.1 Development of 3d digital site model 1 4 16 21 808.69$ <br />8.4.2 Coordinate with site survey 1 4 16 21 808.69$ <br />8.4.3 Produce base map 1 1 8 8 18 843.76$ <br />0 -$ <br />Work Element 8.5 - Planning analysis 841.82$ 2,603.33$ <br />8.5.1 Diagram existing networks 1 2 8 11 610.09$ <br />8.5.2 Outline potential connections 1 4 5 231.73$ <br />0 -$ <br />Work Element 8.6 - Alignment and location alternative concepts 5,053.31$ 15,627.36$ <br />8.6.1 Design collaboration with consultant team 3 2 4 20 29 1,667.77$ <br />8.6.2 Development and coordination of 3 design alternatives 2 4 40 46 2,281.70$ <br />City of Everett LMN and Associates <br />Everett Point Industrial Center (EPIC) Bridge Project Project multiplier: <br /># <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.