Laserfiche WebLink
-COFFMAN <br /> ENGINEERS <br /> 1101 2nd Avenue,Suite 400 <br /> Seattle,WA 98101 <br /> ph 206.623.0717 <br /> www.coffman.com <br /> Allied Telesis PANEL SCHEDULE NEW PANEL:1V11 230312 Allied Telesis PANEL SCHEDULE NEW PANEL:P1 230312 <br /> Loccri STORAGE Feed Through:P7 Source:METER CENTER Location: Feed Through: Source: o <br /> Ckt load Description Phase Amp Poles Notes Rec. Ltg. KH. MiJ2.17 <br /> Cord. Non. Total Specifications CKL load Detaription Phase AmP Polas Notes Rec. Ltg. Kit. Mir. Htg. Clg. Cont Non. Total Spedficafana <br /> 1 01 A 125 2 1 10.62 IOM 1 208V LAB A 20 2 1.10 1.10 <br /> 3 - B - - 10.82 lae2 Rating(Amps): 400 3 - B - - 1.10 1.10 Rating(Amps); 200 <br /> 5 - - - C 2Q 2 ase 302 Voltage(L-Q: 208 5 220Y LAB C 20 2 1.10 1.10 <br /> Voltage(L-L): 208 <br /> 7 All A 092 0.02 Phi 3 7 A 1.10 1.10 Phase: 3 <br /> 9 Di B 20 2 1.05 Wire: 4 9 RECEPTS-LAB B 20 1 0.72 0.72 Wire: 4 <br /> 11 C 1.08 Bus Material: Cu 11 RECEPTS-LAB C 20 1 0.72 0.72 Bus Material: Cu <br /> 13 CENTRAL 4 SOUTH AHUS,ERV,BC A 20 2 111 111 Int.Rating: 35,000A 13 RECEPTS-LAB A 20 1 0.54 054 Int.Rating: 10,000A <br /> 15 B 111 111 15 RECEPTS-LAB B 20 1 a7x 0.72 <br /> 17 DH-2 C 30 2 2n Main Lugs Only. - 17 RECEPTS-SERVER,STORAGE C 20 1 000 aw Main Lugs Only: x <br /> 19 - A - - 217 Main Ckt Bi 400 A 19 RECEPTS-CONFERENCE A 20 1 0.72 0.w 1.02 Main Ckt Bi - ALLIED <br /> 21 WATER HEATER B 50 1 590 5.00 21 RECEPTS-LOBBY B 20 1 0.90 1 110 <br /> 23 SPARE C.B. C 20 1 Surface Mtd: X 23 1 RECEPTS-RR,WELLNESS C I 2Q I I toe I toe Surfacetd:M - <br /> 25 SPARE C.B. A 20 1 Flush Mtd: - 25 SPARE C.B. A 20 1 Flash Mtd: - TELESIS <br /> 27 SPARE C.B. B 20 1 27 SPARE C.B. B m I <br /> 29 SPARE C.B. C 20 1 Bonded Grid: - 29 SPARE C.B. C 20 1 Bonded Grid: - <br /> 31 SPARE C.B. A 20 1 Isolated Grid: - 31 SPARE C.B. A 20 1 Isolated Gnd: - <br /> 33 SPARE C.B. B 201 200%Neutral: - 33 SPARE C.B. B m 1 200%Neutral: - <br /> 35 SPARE C.B. C m 1 Feed Thro: X 35 SERVER 5-20R C 20 1 Mill ale Feed Thru: - Silver Plaza <br /> 37 SPARE C.B. A 20 1 Double Lug: - 37 SERVER 5-20R A 20 1 0.18 0.18 Double Lug: - <br /> 39 SPARE C.B. B m 1 Top Feed: - 39 SERVER 5-30R B 30 I 1.50 1.50 Top Feed: - Floor 2 <br /> 41 SPARE C.B. C 20 1 Bottom Feed 41 SERVER 5-30R C 30 1 130 Iso Bottom Feed <br /> 2 SPARE C.B. A 1 20 1 1 2 LIGHTING-SOUTH A 20 I 095 ass <br /> 4 SPARE C.B. B 20 1 4 LIGHTING-CENTRAL B 20 1 1.12 1.12 <br /> 6SPARE C.B. C 20 1 6 LIGHTING-NORTH C 20 1 1.13 1.13 10521 19th Ave SE <br /> 8 SPARE C.B. A 20 1 Feed Thm Load: P1 8 LIGHTING-CONFERENCE A 20 1 035 0,35 Feed Th.Load: NONE <br /> 10 SPARE C.B. B 20 1 Phase A. 9.01 10 COFFEE MAKER-BREAK B 20 1 1.00 Im Phase A. Everett, WA 98202 <br /> 12 SPARE C.B. C 20 1 Phase B: 11.55 12 MICROWAVE-BREAK C 20 1 150 Iso Phase B: <br /> 14 SPARE C.B. A 20 1 Phose C: 12.28 14 REFRIGERATOR-BREAK A 20 1 0.67 0.87 Phase C: <br /> 16 SPARE C.B. B 20 1 Total Conn.: 32.84 16 REFRIGERATOR-BREAK B 20 1 ae7 an Total Conn.: <br /> 18 SPARE C.B. C 20 1 10atl From This Panel: 18 REFRIGERATOR-BREAK C 20 1 093 M oatl From Thi.Panel: <br /> 20 SPARE C.B. A 20 1 Phase A 15.12 20 DISHWASHER-BREAK A 20 1 0.50 0.50 Phase A 8.65 Construction Set <br /> 22 SPARE C.B. B 20 1 Phase B: 18.11 22 RECEPTS-BREAK B 20 1 T1s 1.26 Phone B: 11.73 <br /> 24 SPARE C.B. C 20 1 Phase C: 4.17 24 RECEPTS-OPEN OFFICE C 20 1 Mao 0.90 Phase C: 11.28 Revisions <br /> 26 SPARE C.B. A 20 1 Total Conn.: 37.40 26 WORKSTATIONS A 20 1 372 372 1.44 Total Conn.: 31.66 <br /> 28 SPARE C.B. B 20 1 Total Connected Load: 28 WORKSTATIONS B 20 1 0.72 0.72 1.44 Total connanad Load: <br /> 30 SPARE C.B. C 20 1 Ph. . 24.13 30 WORKSTATIONS C 20 1 0.72 0.72 1.44 phase A: 8.65 <br /> 32 SPARE C.B. A 20 1 Phase B: 29.66 32 WORKSTATIONS A 20 1 354 038 ago Phase B: 11.73 <br /> 34 SPARE C.B. B 20 1 Phase C: 16.45 34 PRINTER B 20 1 190 193 Phase C: 11.28 <br /> 36 SPARE C.B. C 20 1 Total Conn.: 7024 36 SPARE C.B. C 20 1Total Cona.: 31.66 <br /> 38 SPARE C.B. A 20 1 Total Feeder Demand Load: 38 SPARE C.B. A 20 1 Total Feeder Demand Load: <br /> 40 SPARE C.B. B 20 1 Total: 80.11 IGA 40 SPARE C.B. B 20 1 Total: 30.07 10%42 SPARE C.B. C 20 1 A .Am Phase: Ink 42 SPARE C.B. C 20 1 A .Ams hose: .9 A <br /> CATEGORY IOTIL CONN. DEWND FACTOR DEMAND CATEGORY TOTAL CONN. DEMAND FACTOR DEMYD <br /> LOAD(KVA) LOAD(KVA) LAAO(KVA) LAAO(KVA) fid <br /> Receptacles 11.34 50%1 10.67 Receptades 11.16 50%NOKVA 10.08 <br /> Lighting 115 125% 4.31 Lighting 145 125% 4.31 <br /> Kitchen Equipment 8.17 NEC 220.56 4.01 Keyed Nates: Kitchen Equipment 5.17 NEC 220.56 3.36 K <br /> Motors(Largest) 125% 1.PROVIDE SUB-FEED BREAKER AS REQUIRED Motors(Largest) 125% <br /> Motors 100% Motors 1OD% <br /> Heating s.w NEC 220.60 s.w Heating NEC 220.60 <br /> Cooling NEC 220.60 Coaling NEC 220.60 <br /> Continuous Load 3.36 125% 420 Continuous Load 338 125% 410 <br /> Nan-Continuous Load 39.42 100% 39.42 Non-ConOnuoue Load 8.52 100% 8.52 <br /> TOTAL 70.24 89.11 COFFMAN ENGINEERS,INC. TOTAL 31.66 30.77 COFFM AN ENGINEERS,INC. <br /> Registration <br /> BST <br /> '(c <br /> ea <br /> r <br /> c� <br /> 45932 <br /> RACISfER� <br /> SIONAL <br /> 3012023 <br /> Key Plan <br /> hes , .. <br /> PANEL <br /> SCHEDULES <br /> Scale: NONE <br /> CEI Project No: 230312 <br /> Date: 3.7.2023 <br /> Designed: J. MAXWELL <br /> Drawn: R. FROGGE <br /> Checked: B. MAXWELL <br /> Sheet Number <br /> E-6 . 1 <br />