My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />8 <br />Meetings <br />• On-site structural observations. <br />Work Products <br />• Contract, City required, and IBC required structural observations field memoranda. <br />• Condition assessment findings memoranda. <br />Task 400 – Submittal Review <br />Objective: Review and provide comments with dispositions for Contractor submittals and <br />resubmittals. <br />Activities/Approach: This task includes the following activities: <br />• Review submittals assigned to BC by the City. <br />• Review Division 1 submittals related to work plans, temporary controls, schedule, quality control, <br />warranty and bonds, and record drawings in a secondary capacity to the City’s CM. <br />• Bring to the attention of the City’s CM any potential issues stemming from submittal reviews, <br />including potential change orders, field directives, and concurrent impacts to other submittal <br />information previously submitted or to be submitted. <br />Task Assumptions <br />• Anticipated number of submittals is no greater than 23, not including resubmittals. <br />• Resubmittal rate is no greater than 50%. <br />• Average level of effort per submittal (including resubmittals) is no more than 8 hours. <br />• City’s CM will administer and manage submittals, including processing and tracking, screening <br />for completeness, distributing to the appropriate reviewers, and returning review comments to <br />Contractor. <br />• Submittals with responses which change contract price or duration will be assigned a Change <br />Order Proposal Number by the City’s CM and further tracked as a contract change by the City. <br />• An increase in the number or complexity of submittals beyond the estimated amount may require <br />an increase to the anticipated level of effort. <br />• Submittal preparation quality is dependent on Contractor’s administration quality control and is <br />not within the control of the City or Engineer. <br />• Submittal metrics will be reviewed monthly and included in the monthly progress report. <br />• City’s CM will review contractor schedule submittals, schedule of values, and other <br />administrative submittals made pursuant to Division 1. <br />• BC will review CPM schedule and updates, but in a secondary capacity to the City’s CM. <br />Everett Responsibilities <br />• Review and respond to submittals to which the City has been assigned. <br />Meetings <br />• Effort for attendance at pre-submittal review meetings is budgeted under Task 200. <br />Work Products <br />• Submittal review comments on BC “Submittal Review Comment” form (SRC) with dispositions.
The URL can be used to link to this page
Your browser does not support the video tag.