My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />24 <br />Task Assumptions <br />• BC can work directly with HDR to simplify Package D updates within model. <br />• Stormwater system isolation is feasible within existing structures in vicinity of Grand Avenue <br />Pedestrian Bridge <br />Everett Responsibilities <br />• Attend meetings. <br />• Review TMs and provide feedback on recommendations. <br />Meetings <br />• Stormwater peak flow management option meeting. <br />• Maintenance and failure mode selection meeting. <br />• Maintenance and failure mode analysis debrief meeting. <br />Work Products <br />• Stormwater Peak Flow Management brief TM. <br />• LS46 Model-Based Design Recommendations brief TM. <br />• Maintenance and Failure Modes Analysis TM. <br />Phase 450 – Permitting Support <br />Objective: Coordinate project permitting needs between City of Everett and project permitting <br />subconsultant (ESA). Perform Project permitting not completed by environmental subconsultant, <br />including PSCAA NOC, Stormwater Pollution Prevention Plan (SWPPP), and Construction Stormwater <br />NPDES Permits. Permitting subconsultant activities are summarized in Scope of Work Task 415. <br />Activities/Approach: This task includes the following activities: <br />• Develop communication plan for permit coordination between BC, permitting subconsultant, and <br />governing agencies (City and State). <br />• Support and contribute to development of project permitting materials by the City and by the <br />permitting subconsultant. This work includes providing project background information and <br />design documents to the permitting subconsultant. This work may also include drafting permit <br />information or supporting documentation, e.g., for SEPA checklist and Substantial Development <br />Permit prior to bidding. <br />• Organize and attend permitting coordinating meetings with permitting subconsultant, BC design <br />team, and permitting agencies. <br />• Attend pre-application meeting with City Planning Departments. <br />• Prepare Puget Sound Clean Air Agency (PSCAA) Notice of Construction (NOC). <br />• Prepare SWPPP on City’s behalf. Coordinate civil design team to incorporate SWPPP <br />requirements into design documents as needed. <br />• Prepare Construction Stormwater General NPDES Permit application on City’s behalf. <br />• Coordinate BC and City review of subconsultant work products including draft environmental <br />permit applications. <br />• Complete review of City and subconsultant prepared permit applications and supporting <br />documentation. <br />• Organize subconsultant field work to complete project permit applications.
The URL can be used to link to this page
Your browser does not support the video tag.