My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />26 <br />The Intermediate and Final Design submittals will include unsigned Washington State Professional <br />Engineer seals and be stamped “Preliminary – Not for Construction”. The Bid Documents and <br />Conformed Documents will include signed Washington State Professional Engineer seals. <br />The subtasks under each detailed design phase are generally grouped by discipline or facility then <br />discipline and are consistent from phase to phase as shown in the table below. Subtasks 501, 601, <br />and 801 are all QA/QC activities for the respective phase. <br />Phase 500 – Intermediate Design <br />Objective: Obtain approval from the City on the complete arrangement of the proposed design. This <br />is considered the design scope freeze point. Civil, structural, architectural, and process mechanical <br />models are largely complete and all major design decisions have been reached and approved. <br />Electrical, instrumentation, and building mechanical models have been progressed. Major <br />construction documents drawings and specifications have been progressed. Provides an updated <br />cost estimate and construction schedule. <br />Phase 600 – Final Design <br />Objective: The final design presents the completion of construction documents. Completion of the <br />remaining discipline models. Construction documents are complete with the appropriate level of <br />detail. Final Design documents will be submitted to the appropriate permitting agency(ies) and <br />other stakeholders for review and comment. Comments will be incorporated from permitting <br />agency(ies) and other stakeholders into Bid Documents. Bid Documents will be resubmitted to <br />permitting agency(ies) for final record of approvals. A final cost estimate and construction schedule <br />is developed. <br />Phase 650 – Bid Documents and Services During Bidding <br />Objective: The bid set phase develops the documents to bid ready status. Update of the Final <br />documents based on comments from permitting agency(ies), Client procurement department, and <br />other stakeholders. Updates that impact the design will require further QA/QC and the cost estimate <br />and construction schedule will be updated accordingly. <br /> <br />List of Subtasks per Detailed Design Phases <br />Phase 500 – Intermediate Design Phase 600 – Final Design Phase 650 – Bid Documents and <br />Services During Bidding <br />501 QA/QC 601 QA/QC 801 QA/QC <br />502 Design Mgmt and <br />Coord <br />602 Design Mgmt and <br />Coord <br />802 Design Mgmt and <br />Coord <br />503 BIM Mgmt 603 BIM Mgmt 803 BIM Mgmt <br />504 External <br />Mtgs/Workshops <br />604 External <br />Mtgs/Workshops <br />804 External <br />Mtgs/Workshops <br />505 Internal Mtgs 605 Internal Mtgs 805 Internal Mtgs <br />506 Construction Cost and <br />Schedule Estimate <br />606 Construction Cost and <br />Schedule Estimate <br />806 Construction Cost and <br />Schedule Estimate <br />507 Constructability 607 Constructability 807 Not used <br />508 30% VE Review <br />(OPTIONAL) <br />608 Not used 808 Services During Bidding <br />509 Not used 609 Not used 809 Conformed Docs
The URL can be used to link to this page
Your browser does not support the video tag.