My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />28 <br />Activities/Approach: The following describes the activities/approach that will be used for each <br />discipline or facility throughout phases 500, 600, and 650, where X equals 5, 6, or 8, respectively: <br />• Task X01 – Quality Assurance/Quality Control <br />− Prepare a QA/QC plan and provide senior oversight to plan, monitor, and control the project <br />quality to meet the project goal within the established budgets and schedule. <br />− Manage and implement the QA/QC plan during this phase. <br />• Task X02 – Design Management and Coordination <br />− Manage and direct the design process so that the products of the design effort are contract <br />documents suitable for construction and reflect the City standards and preferences. The <br />design process will be managed to provide complete, coordinated, and consistent designs <br />between facilities and disciplines. <br />− Check on the design team progress and communicate results to project management. <br />− Verify QMP is followed, reviewers concur with work products, and maintain documentation of <br />QA/QC reviews, responses, and resolutions. <br />− Maintain ongoing communications with the subconsultants and monitor subconsultant <br />progress related to the technical execution of the design. <br />− Conduct internal design team coordination meetings. <br />− Manage internal resources to maintain project schedule and achieve contracted milestones. <br />− Identify scope changes that impact the project budget and schedule. Notify the Project <br />Manager of potential changes in scope and assist in documenting those changes. <br />− Regularly assess progress and earned value and maintain risk register. <br />− Coordinate progress reviews by the City, including collecting comments from the City’s <br />review, distributing review comments to facility and discipline leads, facilitating responses to <br />review comments, documenting responses to the City’s review comments, addressing any <br />subsequent issues resulting from the City’s review and addressing any subsequent issues <br />resulting from the response to the City’s review comments. <br />− Monitor compliance with project standards such as equipment numbering system, drawing <br />presentation, and previously developed design guides. <br />− Maintain equipment list. <br />• Task X03 – BIM Management <br />− Manage compliance with project CAD/BIM software standards, graphics standards, file <br />naming conventions and standards, and revision/iteration control. <br />− Manage compliance with and update the BIM Execution Plan (BXP) where changes are <br />indicated to guide the use of BIM tools over the life of the project. Identify and document new <br />project goals and BIM objectives, organizational roles and responsibilities, execution process <br />workflows, collaboration procedures and platforms, and model and drawing QC procedures. <br />− Implement and manage CAD Standards and BXP through the duration of the design. <br />− BIM model maintenance and coordination. <br />− Conduct internal coordination meetings with BIM/CAD production team.
The URL can be used to link to this page
Your browser does not support the video tag.