Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />32 <br />• Lead negotiations with the recommended contractor selected for bid award. <br />Work Products <br />• Workshop materials. <br />• Intermediate design drawings and specifications. <br />• Intermediate design construction cost and schedule estimate. <br />• Final design drawings and specifications. <br />• Final design construction cost and schedule estimate. <br />• Bid document drawings and specifications. <br />• Bid documents construction cost and schedule estimate. <br />• Preliminary Design Value Engineering Review Report (Optional) <br />• Answers to bidder questions. <br />• Addenda <br />• Conformed drawings and specifications <br />Phase 670 – Storage Facility Services During Construction <br />Task 101 – Construction Administration <br />Objective: Provide administration of activities associated with storage facility package services <br />during construction. <br />Activities/Approach: This task includes the following activities: <br />• Provision of a full time Construction Administrator (CA). CA will be responsible for oversight and <br />coordination of consultant construction phase activities. <br />• Coordination with City public works, building, and operations staff, City’s Construction Manager <br />(CM), office engineering staff, and subconsultants performing construction phase services. <br />• Management of subconsultant services during construction. <br />• Attend external meetings and workshops, including check-in meetings between City PM and BC <br />PM and between the City and City’s Construction Manager when requested. <br />• Assist with public engagement support with provision of technical content and review of public <br />information releases. <br />• Provide Quality Assurance and Quality Control in construction phase deliverables to include <br />meeting agenda and notes, submittal review comments, RFI responses, change order designs, <br />and Engineer’s Operation and Maintenance Manual. <br />Task Assumptions <br />• Storage Facility construction phase duration will be no longer than 30 months (Notice to Proceed <br />until Physical Completion). <br />• City will directly contract with a third-party CM firm for the Storage Facility Package. The third- <br />party CM Firm will lead Owner agency on behalf of the City with respect to the construction <br />contract. <br />• City’s CM will set up and maintain a project document management system (DMS), including <br />holding training workshop(s), for parties to the construction contract in its use. <br />• City’s CM will establish workflows for submittal and RFI reviews.