Laserfiche WebLink
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />33 <br />• Meetings under Task 100 are without the Contractor and relate to services of BC as an Owner’s <br />Representative. <br />Everett Responsibilities <br />• Participate in meetings. <br />• Attend document management system and construction protocols training workshop hosted by <br />3rd party CM. <br />• Engage with CA to maintain familiarity with construction progress, needs, and issues. <br />Work Products <br />• None. <br />Task 200 – Field Services <br />Objective: Perform field activities and services that take place on-site at PGSF. Attend construction <br />meetings with the Contractor up to the meeting allowances identified, including preparation and <br />documentation. <br />Activities/Approach: This task includes the following activities: <br />• Attendance at construction progress meetings. <br />• Attendance of special meetings consisting of pre-submittal meetings, quality control meetings, <br />and other special meetings as requested by the City or City’s CM staff. <br />• Geotechnical engineering site visits, field memoranda, and technical meeting attendance. <br />• Surveying activities consisting of establishment of benchmarks, verification of contractor <br />surveys, spot checks for structure and pipeline elevations, survey for change order designs, and <br />other survey needs. <br />• Corrosion control subconsultant site visits, field memoranda, and technical meetings attendance <br />allowance budget is limited to $12,000. <br />• Up to 82 periodic site visits of durations up to 6 hours for one staff member by design engineers <br />for site civil, utilities, electrical, instrumentation and controls, building mechanical, process <br />mechanical, and structural disciplines. Also see Task 300 for structural observations required by <br />building codes. <br />Task Assumptions <br />• City’s third-party CM will administer and prepare construction progress meeting agenda and <br />notes. <br />• City’s third-party CM Field Representative will perform regular, day to day construction <br />observation and complete daily inspection reports to record construction activities on each <br />working day. <br />• BC will prepare meeting agenda and notes for any special meetings requested by the Engineer. <br />Otherwise, special meetings requested by City, Contractor, or City’s CM staff will have meeting <br />notes prepared by City’s CM staff. <br />• Surveying activities allowance is for a 2-person crew cumulatively for 10 working days over the <br />construction duration. <br />Everett Responsibilities <br />• Provide site access during normal working hours when requested, including prior to and after <br />contractor mobilization to the site.