Laserfiche WebLink
VERETT <br />0 <br />Permit Number: E2212-118 <br />Applied: 12/15/2022 <br />Issued: 12/16/2022 <br />Status: FINALED <br />Parent Permit: B2212-047 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:12/15/2022 <br />Fi n a I ed : 5/31/2023 <br />Description: CIRCUITS - Residential Solar Array <br />Site Address: 1929 75TH ST SE <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: REVOLUTION (CONTRAC) ENERGY SYSTEMS INC <br />Owner: Corinne Shearer <br />Contractor: REVOLUTION (ELEC) ENERGY SYSTEMS INC <br />Details: <br />Grid tied; roof mounted; residential solar array (32) Canadian Solar CS3W-450MS 450 PV Modules <br />5/2/23 SCOPE UPDATE: ADD MAIN PANEL UPGRADE TO 225A AS INDICATED ON DESIGN SUBMISSIONS (NO CHANGE IN FEES DUE) <br />a <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYP INSPECTOR <br />RESULT <br />REMARKS <br />4/28/2023 <br />5/3/2023 <br />ELEC 05-SERVICE <br />MICHAEL <br />NOT READY <br />as noted <br />WICKLANDER <br />Notes: <br />4/25/2023 11:09 AM Revolution Solar <br />Please call the crew to coordinate @ (253) 328-4692 <br />service inspection for disconnect/ reconnect for Main Panel like for like swap <br />Contact Name: Jennifer Sonognini <br />Site Address: 1929 75TH ST SE <br />Phone:2533284692 <br />e-Mail: permits.wa@revolutionsolar.com <br />Installation was not complete at this date. The service was completed on 5/2. Please submit updated drawings for both electrical and building. A new <br />panel is to be put in. Please add that to the permit. <br />5/3/2023 <br />5/3/2023 <br />ELEC 05-SERVICE <br />MICHAEL <br />APPROVAL <br />as noted <br />WICKLANDER <br />Notes: <br />Contact Name: Jennifer Sonognini <br />Site Address: 1929 75TH ST SE <br />Phone:2533284692 <br />e-Mail: permits.wa@revolutionsolar.com <br />Approve service no updated drawings for the solar so that is not approved. A new panel is going to be installed and that needs to be added to the <br />permit and I will inspect that solar at that time. Please provide updated drawings for both the building and the electrical. <br />5/23/2023 <br />5/23/2023 <br />ELEC 05-SERVICE <br />MICHAEL <br />CORRECTION <br />as noted <br />WICKLANDER <br />REQUIRED <br />Notes: <br />5/19/2023 12:28 PM Revolution Solar <br />Need inspection in morning to have a cutover done with SnoPUD in late morning <br />Contact Name: Aiden Slater <br />Site Address: 1929 75TH ST SE <br />Phone:3604819419 <br />e-Mail: permits.wa@revolutionsolar.com <br />Printed: Wednesday, 31 May, 2023 1 of 2 rz <br />SUPERION <br />