Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />Panel has not been installed. It has been paid for however, there is no electrical or building drawings on site. Please leave the requested drawings and <br />do the final connection of the panel. Liquid tire flex is not rated for nonfused conductors per WAC 296.46B. <br />Panel has not been installed. the permit for it has been paid for. however, there is no electrical or building drawings on site. Please leave the requested <br />drawings and do the final connection of the panel. Liquid tite flex is not rated for nonfused conductors per WAC 296.46B. <br />5/30/2023 <br />5/30/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />Notes: <br />5/23/2023 9:19 AM Revolution Solar <br />Please call the installation crew to coordinate @ (253) 328-4692 <br />Contact Name: Jennifer <br />Site Address: 1929 75TH ST SE <br />Phone:2533284692 <br />e-Mail: permits.wa@revolutionsolar.com <br />skb changed Inspection Type from ELEC 05-SERVICE to ELEC 10-FINAL <br />OK partial final is for PV system. Still need inspection in the sub panel for the connections from the service. <br />5/30/2023 <br />5/30/2023 <br />ELEC 10-FINAL <br />STEVE BANKS <br />APPRVD-PERMIT <br />FINAL <br />Notes: <br />Sub panel hook up complete. <br />�A_ <br />Printed: Wednesday, 31 May, 2023 2 of 2 rk <br />SUPERION <br />