Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (10)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (10)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:4.000 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ ONO : SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:3.000kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> /1 REVISIONS <br /> Aro `_6 - HGe O © © DESCRIPTION DATE I REV <br /> y REVISION 10/19/2022 A <br /> o.G<F,r R9A'F © pa S'aSEOFS� <br /> q� 0 <br /> '1100'. 0oa0tHG Teo I� <br /> ONG/'QCT c'J r Gh''pPO� � ra <br /> do Mir <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into < <br /> Bonding Hardware creates bond between solsut, serrated flange nremoves Lfoot iinodizatmn clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ®Aluminum mid clamp with stainless steel bonding pins that pierce module frame Q bar and each rad secr o ©to bond LFoot to stemless steel T-bolt <br /> anodiration to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do <br /> y�Aluminum splice bo spans across east gap to Serrated T-bolt head penetrates ail anodization <br /> V create rad to rail bond.Rail Ono'least one Side grounded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail net force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt m bond T-Dolt.nut,and L-root ro <br /> of splice wnl De grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. O <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end N <br /> modules to SM rail 00 <br /> distance from end of rail, module and prior to the last Cn <br /> end module. <br /> O O <br /> p E U co <br /> titer AllrAirtve > Q c, -. _ 2—► U o <br /> 4— - a-- BONDING Jars a a o y� r, 1 Q W <br /> oy,F m CO <br /> r T-BOLT cRF gkigF ss" � ea b. 0 U LU Q M <br /> Q z W N <br /> AJ >LU m co <br /> •Sn1iN BONDING BONDING MIL 1 /Qj J C) t !, <br /> OUND �.7 MICROINVERTER SPLICE BAR \\ V <br /> ♦ MOUNT - - - / _ <br /> / WEEBLUG(OR ILSCO LUG) /® Z W W O <br /> - - _ 14--1/2' } Q 0 �$ <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with Z <br /> [�Hex mit with capula'tock washer Winds metal (�WEEB washer dimples piece anodlred fait to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, Q <br /> II 4 microinverter flange to stainless sleet T-Doll `-a create bond between rail and luqposition module Rush Z <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails Q Q <br /> 4 to twhit T-Wt head penetrates ail untied ion <br /> ASSEMBLY - — Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more J W <br /> to Dord T-Dolt-nuL and L-loot to grounded <br /> A -C SM mil-.:,_ ,,.,, ;,,,. „l ©pnodde final system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1R'beyond module. <br /> aw.,m.,�.ryr,en�neu un®f,rte n,n ter- :lc..:�g,,,n.l.z ce, ,nr.:e:.,ww 1 Module must be fully <br /> r._„ es weo of rails. impact action of driver begins. supported by rails and �I� <br /> RAILTO L-FOOT d apprwa msmwweRa es�rnr.'w rya l N OT 9 �-/ <br /> w/80-IIOlNG 7-BOLT "9'4 ,-iii QUE VALUE(See t. :.•;.�,C. cannot overhang ends <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. _ <br /> to <br /> N <br /> CSS <br /> r <br /> DATE: 10/19/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />