111 8 AWG THHN/THWN-2,CU.,BLACK IL 1) 24.2 A AC (1) 10 AWG THHWTHWN•2,CU,BLACK(1l) MAX 9 7 A AC 111 10 AWG THHWTHWN-2,CU..BLACK(l1) MAX 9 7 A AC (1)12.2 TC-ER THHN/THWN-2,CU MAX 9 7 A AC
<br /> 11) 8 AWG THHNRHWN•2.CU.,RED IL2) 240 v AC (1) 10 AWG THHNrtHW N 2,CU,RED IL 21 240 V AC 111 10 AWG THHN/THWN•2,CU,RED(l2) 240 V AC (1) 6 AWG BARE,CU(EGQ) 240 V AC.
<br /> 15 111 8 AWG THHN/THWN-2,CU.•WHITE(N) II) 20 AWG THHN/THWN-2 CU.,GREEN(EGC) 111 10 AWG THHN/THWN-2,CU..GREEN(EGC)
<br /> (11 10 AWG THHN/THWN-2,CU.,GREEN(EGC) OR I6 2 UFR W/G(OR NM-BI,TH11NfTHWN-2,SOLID CU.
<br /> (1) 3/4 INCH EMT EXTERIOR (1) 314 INCH EMT EXTERIOR 111 314 INCH EMT(Not R 4gLwvd tw OF-B or NM-B Cable) INTERIOR EXTERIOR
<br /> (2) 10 AWG THHNA"N-2,CU.,BLACK(ll) MAX 9.7 A AC 111 10 AWG THH"WN•2,CU.,BIACX(L11 19 4 A AC (1) 10 AWG THHN/THWN-2,CU.BLACK(ll) 194 A AC BLUE RAVEN
<br /> 6 121 10 AWG THHN/THWH-2,CU.,RED(L 2) 240 V AC 5 I11 10 AWG THHN/THWN-2,CU,RED IL 2) 240 V AC A (1► 10 AM THH"WN-2,CU,RED(l 2) 240 V AC
<br /> (l) ]D AWG TNHN/TNWN 2,CU.,GREEN IEGC) I11 10 AWG THHWrHWN•2,CU-,GREEN(EGC1 Y (1) 10 AWG THHt//THWN-2,CU.,GREEN(EGC)
<br /> u 3/4 INCH EMT EXTERIOR 11 4 INCH EMT UMRIDR III I INCH SCH 90 FVC EXTERIOR 1403 N. Research Way
<br /> Orem, UT 84097
<br /> 800.377.4480
<br /> W W W.BLUERAVENSOLAR.COM
<br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION
<br /> HEREIN CONTAINED SHALL NOT BE
<br /> LOAD SIDE BREAKER IN MSP,INTERIOR POI.DRYWALL CUTS LIKELY REQUIRED TO REACH MSP. ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE
<br /> EXCEPT BLUE RAVEN SOLAR NOR
<br /> SHALL IT BE DISCLOSED IN WHOLE OR
<br /> IN PART TO OTHERS OUTSIDE
<br /> (20) QCeIIS Q.PEAK DUO BLK ML-G10+395 RECIPIENTS ORGANIZATION,EXCEPT
<br /> UL 1703 COMPLIANT IN CONNECTION WITH THE SALE AND
<br /> (E)200A MAIN SERVICE PANEL ENPHASE IQ COMBINER 4
<br /> (20 IQ8PLUS-72-2-U USE OF THE RESPECTIVE EQUIPMENT,
<br /> (E)200A/2P MAIN BREAKER (SOLAR LOADS ONLY) JUNCTION BOX OPTIONAL UL 1741 COMPLIANT WITHOUT THE WRITTEN PERMISSION
<br /> IF OF-B CABLE USED 4"x4"x4"PVC JB-1 EZ SOLAR OF BLUE RAVEN SOLAR L.L.C.
<br /> PV AC DISCONNECT FOR ENTIRE HOMERUN JUNCTION BOX JUN"El
<br /> (E)200A/2P NON-FUSED (N)20A/2P
<br /> L1 LOCKABLE,VISIBLE OPEN L1 JB L1 (1)CIRCUIT OF
<br /> L2 60A,240V,2-POLE L2 L2 NABCEPN EGG __ EGC 4 MODULES--------------------------------------------
<br /> (E)LOADS ENVOY CERTIFIED
<br /> *PV BREAKER TO BE LOCATEDAT OPPOSITE END OF BUSSING 15A/2P 2
<br /> FROM MAIN BREAKER N (N)125A LOAD CENTER PV INSTALLATION
<br /> (N)35A/2P (SOLAR LOADS ONLY) PV CIRCUIT(S) ON DETACHED STRUCTURE PROFESSIONAL
<br /> L1 L1
<br /> N2 N2 Scott Gurney
<br /> EGC GC (N)20A/2P #PV-011719-015866
<br /> --- ------ ---------- --------- ---- -- L1 JB L1 JB-1 L1
<br /> G AC DISCONNECT Lz Lz Lz — _ (1)CIRCUIT OF
<br /> 30ANON-FUSED EGC ___EGC _ 8 MODULES CONTRACTOR:
<br /> 120/240 VAC N 15 15 F
<br /> 60HZ I BRS FIELD OPS
<br /> 1 PHASE
<br /> TO UTILITY 2 1 800-377-4480
<br /> GRID JUNCTION BOX
<br /> G J (N)30 10 P L1 L1 (N)20A/2P L i JB-1 L1 (1)CIRCUIT OF
<br /> Or L2 L2 L2 L2
<br /> EGC EGC G EGC EGC 8 MODULES
<br /> r--- ---- ----- -- ----- — — r--- — -- — -- — —
<br /> I I I I
<br /> r 1 �--J 5
<br /> 4 4 5 L --J 6 2 1 C) C)
<br /> Z Q 0
<br /> (E)GROUNDING (N)%"COPPER GROUND ROD, O O
<br /> ELECTRODE(S) — 8'LONG,MIN.U FROM(E)
<br /> GROUNDING CONDUCTOR. CVQ
<br /> IF REQUIRED,VERIFICATION WILL BE DONE TO TRENCHING T 1 M L
<br /> ENSURE THE GROUNDING ELECTRODE SYSTEM IS GEC INSTALLED PER NEC 23FT THROUGH DIRT
<br /> CONGRUENT WITH CURRENT REQUIREMENTS.(NEC 250.64:6 OR 4 AWG SOLID SCHEDULE 80 PVC CONDUIT
<br /> 250 PART III)IF NOT,A NEW GROUND ROD WILL BE COPPER GEC. LU
<br /> 24"DEEP FROM GRADE O (3) 0 LV W
<br /> INSTALLED. LL = 0) N N
<br /> Z C) C U)
<br /> CU
<br /> LU -a CU H w
<br /> 0 o � c) y
<br /> 1
<br /> Lu LL a�
<br /> N
<br /> iiMliAt�ElltTilt "— N x O (1)
<br /> Coo Qo
<br /> :�y. DRAWING BY:
<br /> w� 8� 2023 .01 . 1 - .ILIw,TT.e�. _:. y
<br /> Tia Bradle kF101: N64 , •11
<br /> I' e PLOT DATE:
<br /> coo �. PUD 2ud745 January 18, 2023
<br /> INTERCONNECTION NOTES 8 15 :37 :25 1 839 096' PROJECT NUMBER:
<br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO Ar
<br /> '
<br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, 54072 - 686917 7
<br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER 0A RFCISTE�L�
<br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT `sSlONALG -07 ' 00 ' SHEET NAME:
<br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ' I ELECTRICAL
<br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF
<br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT ■w REVISION: PAGE NUMBER:
<br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5
<br />
|