Laserfiche WebLink
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />2 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Phase 515 Rehabilitation Method and TM for Existing BNSF <br />Crossing <br />Phase 520 60% design of crossings <br />Phase 530 BNSF permit and supporting TM <br />Final Design <br />Phase 600 Final Design Management <br />Phase 610 Final design <br />Bid Period Services <br />Phase 710 Bid Period Services <br />Unanticipated Services <br />Phase 810 Unanticipated Services <br />Exhibit B – Budget provide additional work breakdown in to additional subphases and tasks for <br />project tracking and control. <br />Scope Descriptions <br />The phase descriptions below include an objective statement, activities/approach, task <br />assumptions, and work products that designate which service or item will be provided by the BC <br />team. City staff activities required to complete tasks are noted where applicable. <br />Scope assumptions applicable to the overall project are described below. <br />Project-level Assumptions: <br />• All deliverables will be delivered in electronic formats, with no printed copies. Bid documents <br />will be digitally signed and sealed per WAC requirements. <br />• The City’s PM will coordinate location for, and City staff participation in project meetings and <br />workshops where noted. <br />• Unless otherwise specified, meetings and workshops will be held virtually. <br />• City PM will provide timely, consolidated staff review comments on draft work products. City <br />review periods will be identified in project schedules. <br />• Mileage for in person meetings and site visits are budgeted assuming the visits are to the <br />Port Gardner site. <br />• Meeting agendas and notes will be prepared by BC. <br />• The City will provide any available plans, construction records, asset information, operational <br />data, existing easement information, easement, property line locations, and related <br />information for water, sewer, and stormwater lines adjacent to all work sites. BC will submit <br />data requests for information that is known to be needed. <br />• The draft scope does not include a detailed seismic evaluation of the proposed infrastructure <br />and adjacent steep slopes and their possible failure modes. <br />• Past studies and reports, including condition assessments, form the basis on which this <br />scope of work has been planned. Discovery of new, unforeseeable, or latent issues <br />associated with the existing site and facilities as uncovered through additional data <br />collection (Phase 210) may result in need for project plan, scope, and budget changes. It is <br />assumed that structures to be reused as described herein are salvageable in their current <br />form without improvements or major structural modifications and support. <br />• For budgeting purposes, it’s assumed the duration of the overall Project will be September <br />2023 through June 2026. The actual project schedule and schedule updates will be