My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />3 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />developed under project management phase. <br />• Work extent and sequence: the scope of work and budget allocation to each phase and task <br />is based on a number of assumptions regarding how the work is envisioned to proceed. <br />Given the nature of design work, the actual level of effort required for each phase/task may <br />require reallocation of funds from one phase/task to another. Therefore, the overall budget <br />estimate for the project defines the extent of the scope of work for this scope. <br />• The Consultant will document any proposed phase budget reallocations between phase <br />levels and all requested changes to this Scope of Work using a Project Change Request <br />(PCR) Form. The Consultant Project Manager will collaborate with the City Project Manager to <br />develop an approach for addressing the change(s). The City Project Manager will review all <br />changes and provide the Consultant with written approval to modify the existing scope, <br />schedule, and budget prior to proceeding with any new work activities. <br />• All Technical Memorandum submittals will include Microsoft Word and .PDF files. <br />• A single set of consolidated review comments will be provided for each reviewed document <br />from the City. <br />• Bluebeam Sessions will be used for drawing review comments. <br />• Technical specifications will be prepared in Division 50 CSI master format using BC <br />standards. <br />• City of Everett to provide General and Supplementary Conditions, Instructions for Bidders, <br />and other “Front End” specifications and contract documents included in Division 0. <br />Project Control <br />Phase 110 – Project Management <br />Objective: Manage the project including scope, schedule, budget, team coordination, and risk. <br />Provide the City with regular updates on progress through meetings and reports. <br />Activities/Approach: Provide management, direction, coordination, and control of all project work, <br />and associated management of project scope, schedule, budget, sub-consultants, technical quality, <br />and monthly progress reports and invoices. This task includes the following activities: <br />• Develop and submit a Project Management Plan (PMP), including project scope, budget and <br />schedule, and initial project risk register. <br />• Develop and maintain a Field Work Safety Plan documenting potential field work hazards, <br />personal protection equipment, and emergency information. <br />• Conduct a virtual project kickoff meeting, including key consultant staff and City staff. <br />• Maintain the PMP including scope, schedule, and budget. <br />• Maintain the project risk register and action, issues and decision logs to aid in collaborative <br />decision making. <br />• Supervise project staff and manage Consultant team budget and schedule. <br />• Prepare monthly project status reports. Progress reports will identify budget status, progress <br />status, activities of the previous month, and up-coming activities. <br />• Prepare project change requests (PCRs), if needed. <br />• Conduct bi-weekly (once every two weeks) calls between BC’s Project Manager (PM) and the <br />City’s PM to review project status, schedule, contract issues, and other project management <br />related issues.
The URL can be used to link to this page
Your browser does not support the video tag.