My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />7 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Everett Responsibilities <br />• Provide available information and GIS database(s) <br />• Attend site visits <br />• Open existing maintenance holes <br />Meetings <br />• None anticipated <br />Work Products <br />• None anticipated <br />Phase 220 – Condition Assessment (CO-3, CO-8) <br />Objective: To plan for, complete, and review obtained conditions of the CO-3 and CO-8 lines <br />Activities/Approach: <br />CO-3: Review CCTV video obtained by City of Everett crew. <br />CO-8: 1. Develop an access plan, identifying access locations, traffic control needs, and <br />supporting information. <br />2. Complete CCTV inspection <br />3. Complete handheld thickness measurements every 50 feet at crown, invert and both <br />springlines. <br />Task Assumptions: <br />• City of Everett will coordinate with others CCTV inspection of the CO-3 line and provide video <br />to BC. <br />• CO-8 inspection work to occur after Phase 240.001 modeling work. Inspection plans may be <br />modified If modeling concludes and City agrees to smaller inner diameter than 48-inches. <br />• City ROW permit will be required for traffic control for access to CO-8 line along WMVD <br />between California Steet and 25th St. <br />• Manned access is available on at least one end of the existing pipeline. <br />Everett Responsibilities <br />• City will complete CCTV inspection of CO-3 line and provide video to BC. <br />• City to provide existing inspection report on the CO-8 line. <br />• City to provide record drawings of existing watermain for CO-8. <br />Meetings <br />• CO-8 Inspection plan review meeting <br />Work Products <br />CO-3: Information for use in Phase 250. <br />CO-8: 1. Inspection Plan <br />2. Traffic Control Plans <br />3. Right-of-Way permit (invoiced in Phase 330) <br />4. CCTV inspection results
The URL can be used to link to this page
Your browser does not support the video tag.