My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />10 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Setback and design guidance from BNSF’s Utility Accommodation Policy, most recent <br />version, will be used. <br />• Hydraulic modeling will be used to assess possible hydraulic jumps and develop possible <br />mitigation strategies. <br />Everett Responsibilities: <br />• Provide GAUP plans <br />• Participate in Pipe Size workshop <br />• Review Pipe Sizing Criteria TM <br />Meetings: <br />• Pipe Location Alternatives and Materials workshop <br />Work Products: <br />• Pipe Location and Materials TM, draft and final <br />Phase 250 – Basis of Design Report <br />Phase Objective: To document the work and decisions completed in the predesign phase. <br />Activities/Approach: This task includes summarizing and documenting the predesign activities to <br />guide future phases of work. <br />• Work will include an executive summary of the condition assessment TM, the stormwater <br />pretreatment TM, the minimum pipe diameter TM, and pipe location TM, which will all be <br />included as an appendix. <br />• City of Everett and proposed project design standards will be stated. <br />• Anticipated permits will be documented. <br />Task Assumptions: <br />• Cost estimates are not included. <br />Everett Responsibilities: <br />• Review BODR <br />Meetings: None <br />Work Products <br />• BODR, draft and final <br />Phase 260 – Project Labor Agreement Evaluation <br />Objective: Evaluate the Project Labor Agreement factors listed in City of Everett Resolution No. 7461 <br />for the PGSF WMVD Storm and Combined Sewer project. The City is currently considering modifying <br />the existing resolution, but no details about potential changes are available at this time. If City of <br />Everett Resolution No. 7461 is superseded or modified, the evaluation will be conducted according <br />to the applicable resolution in-force at the time the evaluation is conducted. <br />Activities/Approach: <br />• Evaluate the project for the factors listed in section 2.a-g of City of Everett Resolution No. <br />7461, or as modified in subsequent resolutions.
The URL can be used to link to this page
Your browser does not support the video tag.