Laserfiche WebLink
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />40 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Solicit and administer public bids for the construction package. <br />• Receive and disseminate requests for information to Consultant and City responders. <br />• Hold pre-bid meeting and pre-bid tours by prospective contractors. <br />• Review bids. <br />• Obtain construction phase permits, or assign responsibility to contractor. <br />• Award construction contract to lowest, responsive and qualified bidder. Administer and <br />execute all contract forms. <br />Meetings <br />• Prebid meetings (4). <br />Work Products <br />• Replies to bidder questions <br />• 2 addendum <br />• Bid review recommendations and bidder reference summaries. <br />Unanticipated Services <br />Phase 810 – Unanticipated Services <br />Objective: Provide budget allowance for potential additional work requested by the City. <br />Activities/Approach: To be determined, based on City requests. No work will be completed under this <br />task without written direction from the City. The budgeted amount for unanticipated services is as <br />provided in Exhibit B. <br />Task Assumptions <br />• Brown and Caldwell will prepare a Project Change Request (PCR) describing each additional <br />and identifiable task under this allowance. The PCR will include a short description of the <br />added scope with budget to be authorized prior to proceeding, unless otherwise directed in <br />writing by the City. <br />Everett Responsibilities <br />• Provide direction and authorization for requested additional work. <br />Meetings <br />• To be determined. <br />Work Products <br />• To be determined. <br /> <br /> <br /> <br />