Laserfiche WebLink
Staff Member Role 2023 Hourly Rate** <br />Abbi Dorn S/W Pre-T/M oversight $312.49 <br />Alexander Mockos Senior Oversight $344.53 <br />Amanda Lawler Modeling $134.52 <br />Ashraf Qadan Structural QA/QC $181.25 <br />Bob Jacobsen Project Manager $268.78 <br />Brent Robinson Modeling Lead $281.26 <br />Casey Gish PGSF Integration $173.68 <br />Catherine Dummer Cost Estimator $227.60 <br />David McBride Design Manager $278.23 <br />Devon Vigil Civil Design $125.00 <br />Erin Melton Delivery Coord. $181.61 <br />Gino Mazzotti Structural Eng $190.00 <br />Jennifer Fu Pre-T/M Design $143.98 <br />Joanna Wilson Accounts $110.50 <br />Kenneth Hoff Safety $242.19 <br />Kirsten Weber Senior Eng $187.46 <br />Lawrence Catalano Inspect./Rehab $287.40 <br />Margaret Ales Modeling Oversight $197.60 <br />Mark Gisse Structural Drafting $177.91 <br />Nathalie Costaz Project Analyst $106.33 <br />Patrick Bohanon Civil Eng $124.41 <br />Rob Davies Civil SME $215.90 <br />Robert Hunt CAD $171.54 <br />Thomas Pennington Geotech QA/QC $360.95 <br />Exhibit B-1: Everett PGSF WMVD A C E Package Project - Staff, Roles, and Rates* <br />* Rates are subject to changes on an annual basis and/or at the time of individual direct <br />labor rate changes. <br />** Rates will be escalated 5% annually on 01/01, beginning on 01/01/2024.