Laserfiche WebLink
ODCs 1 ALLIANCE HWA KBA INC.KPFF INCStaheli Trenchless ConsultantsESAPotholingInspection/Traffic ControlCCTVPhase Phase Description <br />Total <br />ODCs Cost Cost Cost Cost Cost Cost Cost Cost Cost <br />Total Sub <br />Cost <br />Total <br />Expense <br />Cost <br />Total <br />Expense <br />Effort <br />Total <br />Effort <br />100 Project Management 500 500 0 0 0 0 0 0 0 0 0 0 500 500 299,372 <br />110 Project Management 0 0 0 0 0 0 0 0 0 0 0 0 0 0 213,837 <br />120 QA/QC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 85,035 <br />130 ODCs 500 500 0 0 0 0 0 0 0 0 0 0 500 500 500 <br />Leave Blank and Protected <br />200 PreDesign Work 3,500 3,500 0 0 0 0 0 0 0 20,000 30,000 50,000 53,500 56,000 238,620 <br />200 Predesign Mnagement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16,241 <br />210 Background 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18,093 <br />220 Condition assessment (CO-3, CO-8)0 0 0 0 0 0 0 0 0 0 0 0 0 0 26,305 <br />230 Stormwater pretreatment analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 27,766 <br />240 Technical Refinements 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52,839 <br />250 BODR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21,376 <br />255 Sub Tasks 3,500 3,500 0 0 0 0 0 0 0 20,000 30,000 50,000 53,500 56,000 56,000 <br />260 Project Labor Agreement Evaluation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000 <br />Leave Blank and Protected <br />300 Support Services 650 650 332,000 240,000 51,057 200,000 0 80,000 0 0 0 903,057 903,707 948,860 1,165,628 <br />310 Geotechnical Investigation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12,344 <br />320 Topographic Survey and Easements 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,877 <br />330 Permitting 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,699 <br />340 Public Outreach 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56,208 <br />350 Grant Funding 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17,816 <br />360 PGSF Coordination 0 0 0 0 0 0 0 0 0 0 0 0 0 0 81,563 <br />370 Modelling 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21,907 <br />380 Traffic Control 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,678 <br />390 Constructability Review 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,678 <br />301 Sub Tasks 650 650 332,000 240,000 51,057 200,000 0 80,000 0 0 0 903,057 903,707 948,860 948,860 <br />Leave Blank and Protected <br />400 Preliminary Design 100 100 0 0 0 0 0 0 0 0 0 0 100 100 258,870 <br />400 Preliminary Design Management 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17,008 <br />410 30% Design 0 0 0 0 0 0 0 0 0 0 0 0 0 0 221,011 <br />420 Construction Packaging 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14,097 <br />430 Updated BODR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,654 <br />440 ODCs 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 <br />Leave Blank and Protected <br />500 BNSF Trenchless Crossing 200 200 0 0 0 0 192,000 0 0 0 0 192,000 192,200 201,800 251,557 <br />510 Installation method TM & W/S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,832 <br />515 Rehab Method & TM BNSF 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,832 <br />520 60% Design of Crossings 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34,427 <br />530 BNSF Permit & Supporting TM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,665 <br />540 Sub Task 200 200 0 0 0 0 192,000 0 0 0 0 192,000 192,200 201,800 201,800 <br />Leave Blank and Protected <br />600 Final Design 0 0 0 0 0 0 0 0 100,000 0 0 100,000 100,000 105,000 1,137,981 <br />600 Final Design Management 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10,467 <br />610 Final Design 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,018,390 <br />620 Final BODR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,124 <br />630 Sub Task 0 0 0 0 0 0 0 0 100,000 0 0 100,000 100,000 105,000 105,000 <br />Leave Blank and Protected <br />700 Bid Period Services 100 100 0 0 0 0 5,000 0 0 0 0 5,000 5,100 5,350 117,725 <br />710 Bid Period Services 0 0 0 0 0 0 0 0 0 0 0 0 0 0 112,375 <br />720 Sub Task 100 100 0 0 0 0 5,000 0 0 0 0 5,000 5,100 5,350 5,350 <br />Leave Blank and Protected <br />800 Unanticipated Services 0 350,000 0 0 0 0 0 0 0 0 0 0 350,000 350,000 350,000 <br />810 Unanticipated Services 0 350,000 0 0 0 0 0 0 0 0 0 0 350,000 350,000 350,000 <br />Leave Blank and Protected <br />GRAND TOTAL 5,050 355,050 332,000 240,000 51,057 200,000 197,000 80,000 100,000 20,000 30,000 1,250,057 1,605,107 1,667,610 3,819,752 <br />Hours and Dollars are rounded to nearest whole number. <br />Everett PGSF WMVD A C E Package <br />Rates subject to 5%/yr escalation