Laserfiche WebLink
Jennifer FuMargaret AlesCasey GishLawrence CatalanoGino MazzottiMark GisseAshraf QadanDavid McBrideErin MeltonCatherine DummerThomas PenningtonPhase Phase Description <br /> Pre-T/M <br />Design <br /> Modeling <br />Oversight <br /> PGSF <br />Integration <br /> Inspect./ <br />Rehab <br /> <br />Structural <br />Eng <br /> Structural <br />Drafting <br /> Structural <br />QA/QC <br /> Design <br />Manager <br /> Delivery <br />Coord. <br /> Cost <br />Est. <br /> <br />Geotech <br />QA/QC <br />Total <br />Labor <br />Hours <br />Total <br />Labor <br />Effort <br />$143.98 $197.60 $173.68 $287.40 $190.00 $177.91 $181.25 $278.23 $181.61 $227.60 $360.95 <br />100 Project Management 0 20 0 5 0 0 12 98 78 0 0 1,423 298,872 <br />110 Project Management 0 0 0 0 0 0 0 0 0 0 0 1,054 213,837 <br />120 QA/QC 0 20 0 5 0 0 12 98 78 0 0 369 85,035 <br />130 ODCs 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />200 PreDesign Work 74 17 0 38 6 0 0 20 8 0 0 970 182,620 <br />200 Predesign Mnagement 0 0 0 0 0 0 0 16 8 0 0 72 16,241 <br />210 Background 14 0 0 0 0 0 0 0 0 0 0 98 18,093 <br />220 Condition assessment (CO-3, CO-8)0 0 0 36 0 0 0 0 0 0 0 140 26,305 <br />230 Stormwater pretreatment analysis 48 10 0 0 0 0 0 0 0 0 0 160 27,766 <br />240 Technical Refinements 0 7 0 0 0 0 0 0 0 0 0 301 52,839 <br />250 BODR 12 0 0 2 6 0 0 4 0 0 0 124 21,376 <br />255 Sub Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />260 Project Labor Agreement Evaluation 0 0 0 0 0 0 0 0 0 0 0 75 20,000 <br />Leave Blank and Protected <br />300 Support Services 0 0 104 0 0 0 0 104 0 0 24 1,005 216,768 <br />310 Geotechnical Investigation 0 0 0 0 0 0 0 0 0 0 24 40 12,344 <br />320 Topographic Survey and Easements 0 0 0 0 0 0 0 0 0 0 0 24 3,877 <br />330 Permitting 0 0 0 0 0 0 0 0 0 0 0 44 7,699 <br />340 Public Outreach 0 0 0 0 0 0 0 0 0 0 0 280 56,208 <br />350 Grant Funding 0 0 0 0 0 0 0 0 0 0 0 76 17,816 <br />360 PGSF Coordination 0 0 104 0 0 0 0 104 0 0 0 330 81,563 <br />370 Modelling 0 0 0 0 0 0 0 0 0 0 0 123 21,907 <br />380 Traffic Control 0 0 0 0 0 0 0 0 0 0 0 44 7,678 <br />390 Constructability Review 0 0 0 0 0 0 0 0 0 0 0 44 7,678 <br />301 Sub Tasks 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />400 Preliminary Design 62 0 8 0 86 88 4 24 16 68 4 1,402 258,770 <br />400 Preliminary Design Management 0 0 0 0 0 8 0 12 16 0 0 80 17,008 <br />410 30% Design 62 0 8 0 84 80 4 10 0 60 4 1,212 221,011 <br />420 Construction Packaging 0 0 0 0 0 0 0 2 0 8 0 72 14,097 <br />430 Updated BODR 0 0 0 0 2 0 0 0 0 0 0 38 6,654 <br />440 ODCs 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />500 BNSF Trenchless Crossing 0 0 0 0 0 0 0 0 0 0 0 248 49,757 <br />510 Installation method TM & W/S 0 0 0 0 0 0 0 0 0 0 0 16 3,832 <br />515 Rehab Method & TM BNSF 0 0 0 0 0 0 0 0 0 0 0 16 3,832 <br />520 60% Design of Crossings 0 0 0 0 0 0 0 0 0 0 0 184 34,427 <br />530 BNSF Permit & Supporting TM 0 0 0 0 0 0 0 0 0 0 0 32 7,665 <br />540 Sub Task 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />600 Final Design 189 0 0 0 236 262 37 89 50 195 26 5,668 1,032,981 <br />600 Final Design Management 0 0 0 0 0 2 0 2 24 0 0 52 10,467 <br />610 Final Design 189 0 0 0 234 260 37 85 26 195 26 5,597 1,018,390 <br />620 Final BODR 0 0 0 0 2 0 0 2 0 0 0 19 4,124 <br />630 Sub Task 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />700 Bid Period Services 0 0 0 0 16 48 4 0 0 0 0 600 112,375 <br />710 Bid Period Services 0 0 0 0 16 48 4 0 0 0 0 600 112,375 <br />720 Sub Task 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />800 Unanticipated Services 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />810 Unanticipated Services 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />Leave Blank and Protected <br />GRAND TOTAL 325 37 112 43 344 398 57 335 152 263 54 11,316 2,152,142 <br />Hours and Dollars are rounded to nearest whole number. <br />Rates subject to 5%/yr escalation <br />Everett PGSF WMVD A C E Package