Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/29/2023 3/29/2023 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 3/24/2023 6:24 PM LILIANA AGUILAR HERNANDEZ <br /> please call 253-202-4787 with ETA.Framing inspection per previous corrections <br /> Contact Name:LILIANA AGUILAR HERNANDEZ <br /> Site Address:3409 FEDERAL AVE <br /> Phone:2532049348 <br /> e-Mail:expresswa@outlook.com <br /> Post and footing required for support below new beam installed in kitchen per engineer letter.Call for footing inspection when ready.Upload engineer <br /> letter to permit. <br /> Expose footing at room located at bottom of stairs. <br /> Mechanical permit required for new fans in bathroom and laundry duct. <br /> Fireproof around perimeter above top plate with rock wool similar to east laundry room wall.Will verify at insulation inspection. <br /> 4/5/2023 4/5/2023 BLDG 02- RAKEEB KHAN APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> Verified exterior footing depth.Interior post footing ok <br /> Verified exterior footing depth.Interior post footing ok <br /> 4/5/2023 4/5/2023 BLDG 08-FRAMING RAKEEB KHAN PARTIAL see notes <br /> APPROVAL <br /> Notes: <br /> Verify post installed in basement with positive connection at top and bottom at next inspection <br /> Verify post installed in basement with positive connection at top and bottom at next inspection <br /> 4/5/2023 4/5/2023 BLDG 12- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> INSULATION APPROVAL <br /> Notes: <br /> 3/30/2023 12:15 PM LILIANA AGUILAR HERNANDEZ <br /> Call for eta 253-486-5962,insulation inspection,post footing at basement inspection <br /> Contact Name:LILIANA AGUILAR HERNANDEZ <br /> Site Address:3409 FEDERAL AVE <br /> Phone:2532049348 <br /> e-Mail:expresswa@outlook.com <br /> Approved except for kitchen exhaust location. <br /> Approved except for kitchen exhaust location. <br /> 4/12/2023 4/18/2023 BLDG 08-FRAMING RAKEEB KHAN APPROVAL <br /> Notes: <br /> New post connections ok.Inspected on 4/12/2023 <br /> 4/12/2023 F4/12/2023 BLDG 10-DRYWALL RAKEEB KHAN APPROVAL <br /> NAILING <br /> Notes: <br /> 4/18/2023 4/18/2023 BLDG 10-DRYWALL RAKEEB KHAN OTHER <br /> NAILING <br /> Notes: <br /> 253-202-4787 <br /> I <br /> Printed: Friday, 22 September, 2023 2 of 3 rk <br /> SUPERION <br />