My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3409 FEDERAL AVE 2023-12-07
>
Address Records
>
FEDERAL AVE
>
3409
>
3409 FEDERAL AVE 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 11:48:44 AM
Creation date
9/22/2023 1:19:59 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br /> From: Drew Martin <br /> Sent: Friday, October 1, 2021 3:57 PM <br /> To: expressrpm@outlook.com <br /> Subject: City of Everett Permit Services: 3409 Federal Avenue (132109-079) -First Building Intake <br /> Review <br /> Attachments: 2018 IRC-Typical Code References_04-12-2021.docx; CoE_Residential Drawing <br /> Preparation-Edited 09-27-2021.pdf <br /> Hello, Mr. Ponce. <br /> Your application has been received and a permit set up. However, the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Information is attached to provide guidance. Construction-level documents should be submitted for <br /> review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br /> intended to provide a comprehensive review. The resubmittal documents should include an itemized <br /> response letter clarifying how the review comments below have been addressed. Depending on your <br /> experience with the adopted codes and preparing documents, we recommend consulting with a design <br /> professional to assist you. <br /> Intake Review Comments: <br /> General: <br /> 1. The project should specify the applicable building codes, including but not limited to the 2018 IRC, <br /> 2018 WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br /> 2. The submitted documents include sketches for the proposed project. Construction-level drawings <br /> prepared using established drafting standards are required to substantiate compliance with the <br /> IRC. The drawings should include plans, building sections, details, material specifications, design loads, <br /> architectural and structural notes, etc. as needed to clearly show the proposed work. The current <br /> editions of the building codes applicable to the project should be specified. See IRC Section R106.1.1. <br /> 3. The construction drawings should include all levels of the house. Detailed construction information is <br /> not required for areas that are not included in the proposed scope-of-work. At a minimum, the plans <br /> should show the walls, doors, egress routes, windows including egress windows, smoke and CO alarms, <br /> and use of each room. See IRC Section R106.1.1. <br /> 4. The proposed project appears to involve work that is not clearly shown including but not limited to <br /> modifying walls, doors, floors, roof, windows, sinks, showers, and toilets. All proposed work should be <br /> clearly shown in the drawings. The drawings should clearly delineate between existing and new work <br /> using established drafting standards. All demolition should be shown on the existing floor plans. All <br /> new construction should be shown on the new floor plan. Where the proposed project includes <br /> modifications to existing building components (e.g., gypsum wall board, insulation, etc.), these <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.