Laserfiche WebLink
Drew Martin <br />From: Drew Martin <br />Sent: Wednesday, June 7, 2023 10:53 AM <br />To: nwsigncrew@outlook.com <br />Subject: City of Everett Permit Services: 2820 Oakes Avenue (S2305-005) - Second Building <br />Review <br />Hello, Billy. <br />Additional drawings for the sign were uploaded to our permitting system. However, the drawings do not address the <br />First Review comments; they are attached below for your convenience. Calculations substantiating the sign loads and <br />anchorage design should be submitted for review; design criteria provided in the drawings does not satisfy this <br />requirement (note: the criteria is required to be stated on the drawings per IBC Chapter 16 and should not be <br />removed). The make and model of the anchors should be specified on the drawings. <br />The application will be reviewed once all required documentation has been received. Thank you. <br />— Drew Martin, P.E., S.E. <br />Associate Engineer —Commercial Plans Examiner I Permit Services <br />425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm — 3 pm; Tu: 1:00pm-3:00pm <br />everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />From: Drew Martin <br />Sent: Tuesday, May 16, 2023 10:35 AM <br />To: nwsigncrew@outlook.com <br />Subject: City of Everett Permit Services: 2820 Oakes Avenue (S2305-005) - First Building Review <br />Hello, Billy. <br />We have completed the first review of the building plans for this project. This email will serve as the review letter. The <br />comments below should be addressed. Two revised full-sized hard -copies of the drawings should be submitted for <br />review. An itemized response letter stating how each comment has been addressed should be included with the <br />drawing. Additional revised documentation, including but not limited structural calculations and other supporting <br />documentation, should be submitted as required. <br />Comments <br />The project involves a sign that projects perpendicularly from the building face and will be subject to wind <br />loading. Calculations substantiating the design of the sign should be submitted for review. See IBC Sections <br />1604.1, 1604.4, and 1609.1, and ASCE 7-16 Chapter 16. <br />2. Calculations substantiating the anchorage design should be submitted for review. The anchors should be <br />approved for use in anchoring to CMU facades. Where an approved testing report is used to substantiating the <br />design, a copy of the report should be included in the submittal documents. See IBC Sections 104.11.2 and <br />1604.1. <br />