Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />38 <br />• Along with Engineer, conduct comprehensive performance testing of all processes, process <br />equipment, instrumentation and control systems, utilities, and support systems during <br />Commissioning. <br />• Attend factory and off-site testing, as desired. <br />• Adhere to approved Start-Up and Testing Plan submittals and Methods of Procedures (MOPs). <br />• City’s CM to document testing and commissioning activities in IDRs. <br />• City’s CM to document startup and testing meetings, including preparing meeting notes. <br />Meetings <br />• Allowance for 22 start-up and testing visits/meetings on-site and 22 virtual meetings related to <br />all start-up and testing activities. <br />Work Products <br />• Field memoranda content related to startup and testing. <br />• Programming corrective work items list. <br />Task 800 – Completion Activities <br />Objective: To assist with project closeout procedures, perform an arc flash study to confirm as-built <br />conditions, prepare an Engineer’s electronic O&M Manual, and prepare construction completion <br />documentation. Activities under this task generally extend from 60 days prior to substantial <br />completion to engineering services project closeout. <br />Activities/Approach: This task includes the following activities: <br />• Complete discipline engineering walkthroughs to develop corrective work items (punch list items) <br />to supplement those items already noted by the City’s CM. <br />• Discuss corrective work items completion and contribute to decision to sign-off corrective work <br />items with City’s CM. <br />• Conduct arc flash study based on as—built facility conditions. This task includes performing a site <br />visit to confirm breaker settings and updating the SKM model developed during Phase 500 <br />(intermediate design) to reflect the installed electrical equipment. Following confirmation of the <br />arc flash calculations, BC personal will print and apply arc flash labels at the PGSF site. In <br />addition, the final arc flash study results will be document and included in the Construction <br />Completion Report. <br />• Prepare record drawings following final completion with caveats noted under task assumptions. <br />• Prepare a Construction Completion Report consisting of a compilation of the following from the <br />DMS: <br />− Executed Change Orders and Field Orders <br />− RFI Responses <br />− Final accepted versions of Division 2-33 Submittals, excepting preliminary or final O&M <br />manuals. <br />− Field memoranda <br />− Inspector’s Daily Reports (IDRs) <br />− Materials/testing laboratory reports <br />− As-built conditions arc flash study results <br />− Startup and testing reports