Laserfiche WebLink
Helion Energy Shielding Structure-Foundation February 9, 2023 <br /> Helion Energy <br /> r ' <br /> la -- - <br /> - <br /> V <br /> Figure 1—Foundation Overview @ Completion of Top Mat <br /> PW <br /> i <br /> Edge#11 located within <br /> rebar cage at upper mat. <br /> t' Jl <br /> Refer to Det.4/SF6. <br /> a <br /> yrry 1 r i <br /> Figure 2—High congestion of transverse bars and abutment adjacent lap splices <br /> coinciding at rebar cage locations. <br /> PAGE 3 <br />