Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 104 <br />Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br />10.2(2) TRAFFIC CONTROL PLANS. <br />Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br />construction constraints resulting from traffic control. <br />Notify all affected property owners prior to commencing the barricading of <br />streets, sidewalks and driveways. <br />All business driveways shall remain open except as necessary to permit curing <br />of construction materials or for short periods of time as required for <br />excavations. However, at least one driveway per business shall remain open <br />to vehicular traffic at all times unless otherwise approved by the Engineer and <br />affected property owner in writing. <br />Signs and barricades shall be supplemented by lanterns or flasher units during <br />the hours of darkness. <br />Drivers of motor vehicles used in connection with the construction shall obey <br />traffic rules posted for such location in the same manner and under the same <br />restrictions as provided for the drivers of private vehicles. <br />Conduct the Work, at all time throughout the project, in such a manner as will <br />obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br />Keep the streets, sidewalks and private driveways open except for the brief <br />periods when actual Work is being done. <br />No lane closures will be permitted between 3:30 p.m. and 6:00 p.m., unless <br />specifically approved by the Engineer. <br />1-07.23(3) Work Zone Clear Zone <br />Delete 1-07.23(3) in its entirety. <br /> <br />1-07.24 Rights of Way <br />Delete1-07.24 and substitute the following: <br />Street right of way lines, limits of easements, and limits of construction permits are <br />indicated on the Plans. The Contractor’s construction activities shall be confined within <br />these limits, unless arrangements for use of private property are made. <br />Generally, the City will have obtained, prior to bid opening, all rights of way and <br />easements, both permanent and temporary, necessary for carrying out the Work. <br />Exceptions to this are noted on the Plans. <br />Whenever any of the Work is accomplished on or through property other than public <br />right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br />easement agreement obtained by the City from the owner of the private property. Copies <br />of the easement agreements may be included in the Contract Documents or made <br />available to the Contractor as soon as practical after they have been obtained by the <br />Engineer. <br />The Contractor shall not proceed with any portion of the Work in areas where right of <br />way, easements or rights of entry have not been acquired until the Engineer certifies to <br />the Contractor that the right of way or easement is available or that the right of entry has <br />been received. If the Contractor is delayed due to acts of omission on the part of the <br />City in obtaining easements, rights of entry or right of way, the Contractor will be entitled <br />to an extension of time. The Contractor agrees that Delay resulting from City obtaining <br />easement or right of entry or right of way shall not be a breach of Contract.