Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 153 <br />manhole, side sewer pipe, storm drain pipe, catch basins, and underground utility vaults <br />with no direct compensation made. <br />If there is no pay item for pipe abandonment, then it shall be included with the <br />construction of the respective Work including, but not limited to, sewer or storm drain <br />pipe, water main, manhole, catch basin or side sewer with no direct compensation made. <br />If there is no pay item for existing valve abandonment, then it shall be included with the <br />construction of other items of Work with no direct compensation made. <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT <br />2-03.1 Description <br />Supplement 2-03.1 by adding the following: <br />This Work applies to street pavement patching and street reconstruction after completion <br />of utility work. Grading for street reconstruction shall conform to COE Standard Drawing <br />No. 302, unless otherwise noted on the Plans. Grading for pavement patching shall <br />conform to COE Standard Drawing No. 326, unless otherwise noted on the Plans. <br />2-03.2 Vacant <br />Revise 2-03.2 as follows: <br />2.03.2 Materials <br />Materials shall meet the requirements of the following: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />2-03.3 Construction Requirements <br />Supplement 2-03.3 by adding the following: <br />Blasting is not allowed within the City limits of Everett. <br />Use suitable excavated material for roadway embankments. Dispose of surplus <br />excavated material or unsuitable material in accordance with 2-03.3(7). <br />Engineer will not approve payment for unauthorized excavation or embankment, or both, <br />beyond the limits indicated on the Plans. Return areas of unauthorized excavation or <br />embankment, or both, to their original conditions or better at the Contractor’s expense. <br />Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br />Final grading shall produce a uniform surface within established tolerances and without <br />abrupt changes in grade. <br />Construction requirements for pavement patching authorized by Engineer outside of <br />Project limits shall be in accordance with the Section 5-04 and City Standard Drawing <br />No. 326 for existing asphalt concrete over prepared grade. <br />Provide temporary drainage to keep the subgrade free from standing water. <br />Ensure the top six inches of subgrade is free from rocks or cemented lumps larger than <br />2-1/2 inches in greatest dimension. <br />Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br />elevations shown. Take care not to excavate below the specified grades. Maintain all <br />excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br />trash, and other debris. <br />2-03.3(2) Rock Cuts <br />Delete entire section.” <br />2-03.3(3) Excavation Below Subgrade <br />Supplement 2-03.3(3) by adding the following: