My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 156 <br />2-07.4 Measurement <br />Revise 2-07.4 to read as follows: <br />Water will not be measured. <br />2-07.5 Payment <br />Revise 2-07.5 to read as follows: <br />All costs for the Work described in Section 2-07 shall be included with the Work with no <br />direct compensation made. <br />2-09 STRUCTURE EXCAVATION <br />2-09.2 Materials <br />Supplement 2-09.2 by adding the following at end of the materials list: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />2-09.3 Construction Requirements <br />2-09.3(1) General Requirements <br />2-09.3(1)C Removal of Unstable Base Material <br />Delete all paragraphs in 2-09.3(1)C and substitute the following: <br />When the material at the bottom of an excavation is not stable enough to <br />support the Structure, the Contractor shall excavate below grade to the depth <br />required by the Engineer and replace the unstable material with Foundation <br />Material Class A or B. <br />Place Foundation Material Class A or B in layers not more than six inches thick <br />and compact to minimum of 90-percent maximum density as determined by 2- <br />03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material <br />by hauling to a waste site obtained and provided by the Contractor in <br />accordance with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits <br />or hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material <br />shall meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. CDF shall be in accordance with Section 3-20.1 <br />of the Design and Construction Standards and Specifications. Provide wet or <br />flowable CDF with consistency having approximate slump between three to ten <br />inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. <br />Use wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, <br />gravel borrow, washed sand or crushed surfacing top course, the respective <br />limits for trench width or backfill dimensions shall be approved by the Inspector.
The URL can be used to link to this page
Your browser does not support the video tag.