My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 5 – SURFACE TREATMENTS August 2023 <br /> <br />AND PAVEMENTS <br />WO No. – UP3745 SP - 180 <br />5-04.5 Payment <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> <br />Supplement Division 5 of the Standard Specifications by adding the following: <br />5-06 PAVEMENT PATCHING <br />(******) <br />5-06.1 Description <br />This Work shall consist of the reconstruction and patching of trenches and other excavations <br />in paved streets and other paved areas. <br />5-06.2 Materials <br />Provide materials conforming to the requirements specified for the materials in Sections 5- <br />04 & 5- 05 of the Standard Specifications except as modified by these Special Provisions. <br />For HMA pavement patching provide HMA CL 1/2”, PG 64-22 as specified in Section 5-04 of <br />the Standard Specifications. <br />Provide asphalt for temporary pavement patch as either: cold mix asphalt (MC 250) per <br />Section 9-02 of the Standard Specifications or hot mix asphalt (HMA CL 1/2”, PG 64-22). <br />Mineral aggregate of MC 250 shall meet the same requirements as the aggregates used in <br />HMA CL 1/2”, PG 64-22. <br />For cement concrete base pavement patching provide high early strength cement concrete. <br />Provide minimum 4000 psi mix having minimum 3000 psi compressive strength after curing <br />time of three days. <br />Provide crushed surfacing top course used for pavement patching conforming to the <br />requirements of 9-03.9(3) of the Standard Specifications. <br />5-06.3 Construction Requirements <br />5-06.3(1) General <br />Schedule pavement patching to accommodate the demands of traffic and perform as <br />rapidly as possible to provide maximum safety and convenience to public traffic. <br />Placing and compact the trench backfill and the preparation and compaction of the <br />subgrade in accordance with the various applicable sections of the Standard <br />Specifications except as modified by these Special Provisions. <br />Before the pavement patch is to be constructed saw cut the pavement so that the <br />marginal edges of the patch will form a rectangular shape with straight edges and vertical <br />faces. <br />Provide signs, barricades, lights and other warning devices in accordance with the <br />requirements of the "Manual on Uniform Traffic Control Devices" and they maintain 24- <br />hours a day until the patching work is completed and ready for traffic. <br />Complete subgrade compaction prior to the required patching. Compact subgrade to <br />95-percent as determined by the ASTM D2922 (nuclear method). <br />5-06.3(2) Cement Concrete Pavement Patch <br />Place cement concrete pavement in accordance with 5-05.3 of the Standard <br />Specifications and these Special Provisions after the Crushed Surfacing Top Course <br />subgrade for the pavement has been constructed and compacted to line and grade.
The URL can be used to link to this page
Your browser does not support the video tag.