My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 5 – SURFACE TREATMENTS August 2023 <br /> <br />AND PAVEMENTS <br />WO No. – UP3745 SP - 181 <br />Perform all Work accordance with Section 5-05 of the Standard Specifications, except <br />as modified by these Special Provisions and Standard Drawing No. 326. <br />Hand screeding and float finishing of cement concrete pavement patch is allowable. <br />Contractor will not be required to cut cores in accordance with 5-05.3(7) of the Standard <br />Specifications. <br />Form transverse construction joints to match existing pavement transverse joints using <br />a suitable power driven concrete saw. <br />Place cement concrete pavement directly against the bare sawcut vertical face of the <br />adjacent concrete pavement. <br />Finish surface using broom in direction perpendicular to the centerline with a fiber brush. <br />Date stamping pavement will not be required. <br />Cure cement concrete pavement in accordance with 5-05.3(13) of the Standard <br />Specifications. <br />Cement concrete pavement will be measured and paid for by the square yard of <br />completed pavement patch. <br />5-06.3(3) Cement Concrete Pavement Resurfaced with HMA <br />Patch streets having cement concrete pavements surfaced with HMA as shown on <br />Standard Drawing No. 326. <br />The thickness shall be one inch thicker than the existing concrete base or six inch, <br />whichever is greater. The top surface of the concrete patch shall match the top surface <br />of the existing concrete base; in no case shall the top of the concrete be higher than the <br />top of the existing concrete base. Brush finishing will not be required. Joints shall be <br />placed to match existing or as directed by the Engineer. <br />HMA plant mix shall not be placed until three days after the cement concrete base has <br />been placed or otherwise permitted by the Engineer. The HMA plant mix shall not be <br />placed until the concrete base has received a tack coat of CRS-2 at a rate of 0.12 to <br />0.20-gallons per square yard. The edges of the existing asphalt and castings shall also <br />be painted with the tack coat. The HMA pavement shall then be placed, leveled, and <br />compacted to conform to the surface of the existing HMA. Immediately thereafter, all <br />joints between the new and original asphalt pavement shall be painted with CSS-1 <br />asphalt emulsion and covered with dry sand before the asphalt solidifies. <br />Asphalt shall be compacted to 92-percent of maximum density as determined by <br />WSDOT Test Method 705. <br />5-06.3(4) HMA on Granular Base <br />After the Crushed Surfacing Top Course subgrade has been leveled and compacted, <br />HMA CL 1/2”, PG 64-22 shall be placed to a thickness of one inch greater than the <br />existing asphalt pavement depth or to a minimum of three inches, whichever is greater. <br />Asphalt shall be compacted to 92-percent of maximum density as determined by <br />WSDOT Test Method 705. <br />5-06.3(5) Untreated Roadway Surfaces <br />Existing crushed rock, gravel, and oil mat streets shall be restored with Crushed <br />Surfacing Top Course to a compacted depth of four inches within the neat lines of the <br />trench. Crushed surfacing shall be mixed, placed, spread and shaped in accordance <br />with the requirements of Section 4-04 of the Standard Specifications.
The URL can be used to link to this page
Your browser does not support the video tag.