My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 7 – STORM, SEWER, WATER August 2023 <br />WO No. - UPUP3745 SP – 188 <br />pipe diameter or 12-inches, whichever is greater for pipe, except PVC and HDPE <br />pipe, leaving or entering manholes. <br />Place pipes entering or leaving the manhole on firmly compacted bedding. Take <br />particular care in compacting bedding within the area of the manhole excavation <br />that is normally deeper than the sewer trench. Take special care to ensure the <br />annual opening around each pipe entering the manhole is completely and firmly <br />rammed full of non-shrink grout to ensure water tightness. Non-shrink grout shall <br />conform to requirements of 9-03.20.3(2) of the Standard Specifications. <br />Provide a watertight flexible pipe to manhole connector for pipe diameters less than <br />or equal to 24-inches for PVC or HDPE pipes connecting to manhole. Place no <br />PVC or HDPE pipe joint within 10-feet of the outside face of the manhole. <br /> <br />Supplement 7-05.3 by adding the following: <br /> <br />7-05.3(5) Furnish and Install Solid Lid for Catch Basins <br />(******) <br />Provide new solid lids on existing catch basins where shown on the Plans. Provide <br />solid lids conforming to 9-05.15 of the Standard Specifications, 9-05.15(1) of these <br />Special Provisions, and to COE Standard Drawing No. 406 and 410 for Type 1 and <br />1-L Catch Basins and COE Standard Drawing 611 for Type 2 Catch Basins. <br />7-05.4 Measurement <br />Delete all paragraphs of 7-05.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-05.5 Payment <br />Delete all paragraphs of 7-05.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> <br />7-06 WATER QUALITY TREATMENT STRUCTURES <br />(******) <br />7-06.1 Description <br />This Work consists of furnishing and installing Bypass Structure(s), Hydrodynamic <br />Pretreatment device(s) and Water Quality Treatment Structures of the size and model <br />specified and in accordance with the configuration and location shown on the Drawings <br />and these Special Provisions. <br /> <br />7-06.1(1) Water Quality Treatment Units <br />Flow Splitter <br />The Flow Splitter shall be fabricated in accordance with the Drawings, applicable <br />Standard Drawings and the requirements of the Design and Construction <br />Standards and Specifications. The device includes a standard Type 2 catch <br />basin of size identified in the drawings containing fabricated flow control risers. <br /> <br />Hydrodynamic Pretreatment Device <br />The Hydrodynamic Pretreatment device shall be: CDS® device manufactured by <br />Contech Engineered Solutions LLC, of type and configuration indicated in the <br />Drawings, or approved equivalent.
The URL can be used to link to this page
Your browser does not support the video tag.