Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 34 <br /> <br />Provisions, including grinding existing asphalt concrete curb, removal, loading, hauling and <br />disposal. <br /> <br />Bid Item 32 - Plastic Line <br />Center line, no pass line, center line with no pass line, double center line, double lane line, <br />edge line, solid lane line, dotted lane line, dotted extension line, lane line, reversible lane line, <br />and two-way left-turn center line will be measured by the completed linear foot as Plastic <br />Line. <br />The measurement for Plastic Line will be based on the total length of each 4-inch-wide plastic <br />line installed. No deduction will be made for the unmarked area when the marking includes <br />a broken line such as, center line, dotted extension line, center line with no-pass line, lane <br />line, reversible lane line, or two-way left turn center line. <br /> <br />The unit Contract price for Plastic Line shall be full payment for all costs to perform the Work <br />as described in Section 8-22. <br /> <br /> <br />Bid Item 33 - Landscape Restoration <br />Measurement and Payment: Unit Price per Lump Sum (LS) <br />Measurement for providing Landscape Restoration will be lump sum. <br />Payment for Landscape Restoration, Lump Sum, will be limited to dimensions and work limits <br />defined on Drawing C1 or as otherwise approved by the Engineer. <br />The lump sum price for Landscape Restoration shall be full compensation for restoring <br />landscape ares to their pre-construction condition and includes all costs for hauling, <br />stockpiling, placing, grading, compacting, seeding, and controlling moisture content of topsoil <br />materials where indicated. <br /> <br />Also included shall be placement of mulch materials, decorative surfacing, and <br />miscellaneous plantings. <br /> <br />Also to be included in this bid item shall be the cost of all subgrade preparation and grader <br />work, or any other equipment required to establish correct surfaces to proper grade before <br />the topsoil is placed, as well as all equipment required to spread and compact the topsoil <br />uniformly on the surface to be seeded. Also included shall be the costs for removing, loading, <br />hauling, and disposing of unsuitable or displaced materials. <br /> <br />Include cost of sprinkling during dry periods prior to placement of the topsoil and while <br />spreading and compacting the material in the price for this bid item. <br /> <br />Bid Item 34 - Temporary Pavement Patch <br />Measurement and Payment: Unit Price per Square Yard (SY) <br />Measurement for Temporary Pavement Patch shall be by the square yard placed within the <br />sawcut neatline limits of dimensions defined in the Work, descriptions for other bid items, <br />shown on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer.