My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 34 <br /> <br />Provisions, including grinding existing asphalt concrete curb, removal, loading, hauling and <br />disposal. <br /> <br />Bid Item 32 - Plastic Line <br />Center line, no pass line, center line with no pass line, double center line, double lane line, <br />edge line, solid lane line, dotted lane line, dotted extension line, lane line, reversible lane line, <br />and two-way left-turn center line will be measured by the completed linear foot as Plastic <br />Line. <br />The measurement for Plastic Line will be based on the total length of each 4-inch-wide plastic <br />line installed. No deduction will be made for the unmarked area when the marking includes <br />a broken line such as, center line, dotted extension line, center line with no-pass line, lane <br />line, reversible lane line, or two-way left turn center line. <br /> <br />The unit Contract price for Plastic Line shall be full payment for all costs to perform the Work <br />as described in Section 8-22. <br /> <br /> <br />Bid Item 33 - Landscape Restoration <br />Measurement and Payment: Unit Price per Lump Sum (LS) <br />Measurement for providing Landscape Restoration will be lump sum. <br />Payment for Landscape Restoration, Lump Sum, will be limited to dimensions and work limits <br />defined on Drawing C1 or as otherwise approved by the Engineer. <br />The lump sum price for Landscape Restoration shall be full compensation for restoring <br />landscape ares to their pre-construction condition and includes all costs for hauling, <br />stockpiling, placing, grading, compacting, seeding, and controlling moisture content of topsoil <br />materials where indicated. <br /> <br />Also included shall be placement of mulch materials, decorative surfacing, and <br />miscellaneous plantings. <br /> <br />Also to be included in this bid item shall be the cost of all subgrade preparation and grader <br />work, or any other equipment required to establish correct surfaces to proper grade before <br />the topsoil is placed, as well as all equipment required to spread and compact the topsoil <br />uniformly on the surface to be seeded. Also included shall be the costs for removing, loading, <br />hauling, and disposing of unsuitable or displaced materials. <br /> <br />Include cost of sprinkling during dry periods prior to placement of the topsoil and while <br />spreading and compacting the material in the price for this bid item. <br /> <br />Bid Item 34 - Temporary Pavement Patch <br />Measurement and Payment: Unit Price per Square Yard (SY) <br />Measurement for Temporary Pavement Patch shall be by the square yard placed within the <br />sawcut neatline limits of dimensions defined in the Work, descriptions for other bid items, <br />shown on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.