My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 35 <br /> <br />The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br />Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be full <br />compensation for all work necessary to complete Temporary Pavement Patch in accordance <br />with these specifications. <br />Regardless of duration or sequence of work, this item will be measured and paid one time. <br /> <br />Bid Item 35 - Temporary Water Main Protection <br />Measurement and Payment: Unit Price per Lump Sum (LS) <br />Measurement for providing Temporary Water Main Protection will be lump sum. <br /> <br />The lump sum price for Landscape Restoration shall be full compensation for providing, <br />installing, maintaining, removing and disposal of temporary water main protection measures <br />as indicated in the Drawings or otherwise approved by the Engineer. The lump sum price <br />shall include all earthwork required to install the temporary measures which is not paid under <br />other bid items. <br /> <br />Also included shall be all time and expenses required to coordinate water shutoffs with the <br />City and residents. <br /> <br />Bid Item 36 - Controlled Density Fill <br />Measurement and Payment: Cubic Yard (CY) <br />The unit price per cubic yard for controlled density fill (CDF) shall be full compensation for all <br />labor, material, incidentals, tools and equipment necessary to furnish, deliver, and place <br />controlled density fill for trench backfill above the pipe zone where indicated and as required <br />by the Engineer, from a Contractor-supplied source, in accordance with DCSS Section 3-9.6 <br />and 3-20.1, the Standard Specifications, Special Provisions and Contract Plans. <br />Measurement for controlled density fill will be measured by the cubic yard for the quantity of <br />material placed by neatline calculations, within limits of dimensions defined in the Work, <br />descriptions of other bid items, shown on the Plans, details or COE Standard Drawings or as <br />otherwise approved by the Engineer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.