Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 54 <br />If there is a geotechnical report made by the City, Bidder may contact City of Everett <br />Project Manager to arrange to view the geotechnical report. <br />The availability of subsurface information from the City shall not relieve the Bidder <br />or the Contractor from risks or of their duty to make examinations and investigations <br />as required by Section 1-02.4(1) or other responsibility under the Contract or as <br />may be required by law. <br />1-02.5 Proposal Form <br />Delete this section and substitute the following: <br />The Proposal Form identifies the project and its location and describes the Work. It also <br />lists estimated quantities, units of measurement, the items of work, and the materials to <br />be furnished at the unit bid prices. Bidder shall complete spaces on the proposal form <br />that call for, and are not limited to, unit prices; extensions; summations; the total bid <br />amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment <br />of addenda; bidder’s name, address, bidder’s email address, telephone number, and <br />signature; bidder’s UDBE/DBE/M/WBE commitment, if applicable; a State of <br />Washington Contractor’s Registration Number; and a Business License Number, if <br />applicable. Bids shall be completed by typing or shall be printed in ink by hand, <br />preferably in black ink. The required certifications are included as part of the Proposal <br />Form. <br />Bidder shall submit Bidder’s Proposal on the Proposal Form provided in the Contract <br />Documents. <br />The City reserves the right to arrange the proposal forms with alternates and additives, <br />if such be to the advantage of the City. Bidder shall bid on all alternates and additives <br />set forth in the Proposal Form unless otherwise specified. <br />1-02.6 Preparation of Proposal <br />Delete “unless it approves in writing” from the second sentence of the first paragraph of 1- <br />02.6. <br />Revise the fourth paragraph of 1-02.6, beginning with “The Bidder shall submit with the Bid <br />a completed Disadvantaged Business Enterprise (DBE) Utilization Certification”, to read as <br />follows: <br />Contractor agrees that the Contractor shall actively solicit the employment of minority <br />group members. Contractor further agrees that the Contractor shall actively solicit Bids <br />for the subcontracting of goods or services from qualified minority businesses. <br />Contractor shall furnish evidence of the Contractor's compliance with these <br />requirements of minority employment and solicitation. Contractor further agrees to <br />consider the grant of subcontracts to said minority bidders on the basis of substantially <br />equal proposals in the light most favorable to said minority businesses. The Contractor <br />shall be required to submit evidence of compliance with this section as part of the Bid <br />by submitting the RCW 35.22.650 Certification. <br />Delete the sixth paragraph of 1-02.6, which begins with “The Bidder shall submit with their <br />Bid a completed Contractor Certification Wage Law Compliance form (WSDOT Form 272- <br />009).” <br /> <br />Supplement 1-02.6 by adding the following: <br />In the event that the product of a unit price and an estimated quantity does not equal the <br />extended amount quoted, the unit price shall govern, and the correct product of the unit <br />price and the estimated quantity shall be deemed to be the amount bid. If the sum of <br />two or more items in a bidding schedule does not equal the total amounts quoted, the