Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 70 <br />those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br />and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br />steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br />falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br />may include, and not be limited to, Catalog cuts or standard plans for commonly used <br />manufactured items. <br />The Contractor shall be fully responsible for the accuracy of dimensions and details on <br />Working Drawings, and for complete conformity with the Contract Documents, even if <br />the Working Drawings have been approved by the Engineer, or if the Contractor and the <br />Engineer agree on dimensions and details. The City does not accept Working Drawings <br />as accurate or adequate, and does not take responsibility for, or warrant that Working <br />Drawings will meet Contract requirements. <br />Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br />for variation from the requirements of the Contract Documents unless Contractor has in <br />writing called the Engineer's attention to each such variation at the time of submission, <br />and the Engineer has given written approval of each such variation by a specific written <br />notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br />review by Engineer relieve Contractor from responsibility for errors or omissions in the <br />Working Drawings or from responsibility for having complied with the provisions of this <br />section. <br />The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br />The following listed sections of the Standard Specifications and Special Provisions <br />require Working Drawings that may or may not be applicable to this specific project. This <br />list is supplied as an aid to the Contractor and is by no means complete. Submittal <br />requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br />DIVISION 2 EARTHWORK <br />2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br />DIVISION 6 STRUCTURES <br />6-01 General Requirements <br />6-01.9 Working Drawings <br />6-02 Concrete Structures <br />6-02.3(13) Expansion Joints-Shop Drawings <br />6-02.3(16) Plans for Falsework and Forms-Shop Drawings <br />6-02.3(26)A Shop Drawings <br />6-03 Steel Structures <br />6-03.3(7) Shop Plans <br />6-03.3(25) Welding and Repair Welding-Shop Drawings <br />6-04 Timber Structures <br />6-04.3(3) Shop Details <br />6-06 Bridge Railings <br />6-06.3(2) Metal Railings-Shop Drawings <br />6-11 Reinforced Concrete Walls <br />6-11.3(1) Submittals <br /> <br />DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS