Laserfiche WebLink
• • <br /> Scope Of Work <br /> REMOVAL/PREPARATION:Clean entire deck area of all loose debris and prepare for new roof covering. <br /> Inspect deck set any backed out fasteners or pull and replace, as necessary. Prepare for membrane <br /> overlay. <br /> METAL COPING: Remove existing coping metal from walls and re use after membrane installation is <br /> complete. <br /> SUBSTRATE-SEPARATION: Furnish and install 1-layer of Duro-Weave underlayment slip sheet to entire <br /> surface area over the existing roofing system to separate unlike materials. <br /> PERIMETER/WIND-UPLIFT: Furnish and Install factory approved and Pre- Engineered Wind-Uplift course <br /> to all roof areas in accordance with local building codes and to meet a FM 1-60 wind uplift design. <br /> ROOF COVERING: Furnish and Install 50-MIL WEFTED REINFORCED DURO-LAST ENGINEERED Single-Ply <br /> PVC Roofing Membrane to Entire Roof Deck area. Installation to Meet and/or exceed Manufacturer <br /> installation recommendations. Roof to be mechanically fastened with screws and plates. <br /> MEMBRANE VENTS: Furnish and install new membrane vents 1/1000 S.F. roof area compatible units color <br /> matched to field membrane. <br /> VENTILATION:To Maintain existing <br /> STACK/VENTS/PLUMBING: Furnish and Install Prefabricated pipe/Stack flashings around vent pipes, <br /> penetrations, and unit curbs. <br /> CLEAN-UP:Clean-up and Haul away of all resultant debris to be included with this proposal/specification. <br /> I,. <br /> CITY OF EVERETT <br /> REVIEWED FOR PERMIT <br />