|
GRILLE, REGISTER AND DIFFUSER SCHEDULE
<br />EQUIP.
<br />SERVICE
<br />MANUFACTURER
<br />MODEL
<br />DESCRIPTION
<br />ID NO,
<br />STYLE
<br />MATERIAL
<br />FRAME
<br />FRAME MODEL
<br />FACE SIZE
<br />NECK SIZE
<br />MAX CAN
<br />BRANCH DUCT
<br />NO
<br />COLOR
<br />NOTES
<br />84
<br />CEILING DIFFUSER
<br />PRICE INDUSTRIES
<br />MCD
<br />SMCD
<br />STEEL
<br />SURFACE
<br />BORDER TYPE 1
<br />24x24
<br />22X22
<br />550
<br />12
<br />18
<br />WHITE
<br />C2
<br />RETURN GRILLE
<br />PRICE INDUSTRIES
<br />80
<br />EGGCRATE
<br />ALUMINUM
<br />LAY IN
<br />BORDER TYPE 3
<br />2424
<br />22X22
<br />1200
<br />PER PLAN
<br /><12
<br />WHITE
<br />At
<br />RETURN AIR CANOPY
<br />PRICE INDUSTRIES
<br />RAC
<br />RETURN AIR CANOPY
<br />ALUMINUM
<br />ALUMINUM
<br />-
<br />24.24
<br />-
<br />-
<br />-
<br />-
<br />-
<br />rnnl IKIC I ndn rAI rI II ATInKI
<br />TOTAL LATENT COOLING
<br />TOTAL SENSIBLE
<br />WINDOW LENGTH
<br />WALL LENGTH
<br />AREA
<br />PEOPLE
<br />OCCUPANT COOLING
<br />ENVELOPE COOLING
<br />LIGHTING LOAD
<br />EQUIPMENT LOAD
<br />LOAO -
<br />COOLING LOAD -
<br />SAFETY FACTOR LOAD
<br />TOTAL SENSIBLE
<br />COOLING AIRFLOW
<br />ZONE DESCRIPTION
<br />EXPOSURE
<br />(FT)
<br />(FT)
<br />(SQ-FT)
<br />(QTY) 131
<br />(BTUH)
<br />(STUN)
<br />(BIGHT [1]
<br />(BTUH) [2]
<br />W/0 SAFETY FACTOR
<br />W/0 SAFETY FACTOR
<br />(BAH)
<br />COOLING
<br />(CAM)
<br />(BUTN)
<br />(BOTH)
<br />(NTUH)
<br />CONTROL ROOM
<br />0,00
<br />0,00
<br />0.00
<br />1,504
<br />16
<br />4,000
<br />0
<br />5,133
<br />4,096
<br />4,000
<br />13,229
<br />1,723
<br />18,952
<br />873
<br />NUNS:
<br />1. LIGHTING LOAD BASED ON 1DW/ SF
<br />2. EQUIPMENT LOAD BASED ON EQUIPMENT LIST HEAT GAIN PER TABLE AND EQUIPMENT LAYOUT ON ARCHITECTURAL PLANS
<br />3. PEOPLE QUANTITY BASED ON ARCHITECTURAL FURNITURE LAYOUT
<br />L INf. OAn CAI CIT ATION
<br />WALL k WINDOW
<br />ROOF ENVELOPE HEAT
<br />VENTILATION AIR HEAT
<br />HEATING TOTAL - W/O
<br />ZONE DESCRIPTION
<br />EXPOSURE
<br />WINDOW LENGTH
<br />WALL LENGTH
<br />AREA
<br />ENVELOPE HEAT LOSS
<br />LOSS
<br />LOSS
<br />SAFETY FACTOR
<br />SAFELY FACTOR LOAD
<br />MINIMUM HEATING TOTAL
<br />HEATING AIRFLOW
<br />(EX)
<br />(EX)
<br />(BTUH)
<br />(BTUH)
<br />(BIUH
<br />(BIGHT
<br />(BTUH
<br />(BIGHT
<br />(CFM)
<br />CONTROL ROOM
<br />0.00
<br />0.00
<br />0,00
<br />1,504
<br />0
<br />0
<br />5,282
<br />5,282
<br />1,056
<br />6,338
<br />349
<br />QE
<br />EQUIPMENT LIST AND HEAT GAIN ASSUMPTIONS [1,2]
<br />EQUIPMENT PEAK, W D4-213
<br />COMPUTER STATION 1. 8
<br />TOTAL W 1,200
<br />NOTES:
<br />1. NAMEPLATE AND PEAK INFORMATION REFERENCED FROM ASHRAE FUNDAMENTALS
<br />2. EQUIPMENT UST IS FOR REFERENCE ONLY - SEE ARCHITECTURAL PLANS FOR EQUIPMENT LAYOUT AND OTY.
<br />MINIMUM VFNTII ATION CAI CUI ATION
<br />LVL IROOM
<br />AREA
<br />SOFT.
<br />OCCUP. DENSITY
<br />PPL/1000 SF [i]
<br />PEOPLE
<br />CFM/PERSON
<br />CFM/SQFT
<br />PEOPLE
<br />DIVERSITY
<br />Vbz
<br />CFM
<br />EXHAUST
<br />CFM
<br />I CONTROL ROOM (OFFICE SPACE)
<br />11504
<br />[41
<br />16
<br />5.0
<br />0.06
<br />1.00
<br />175
<br />1 OFFICE SPACE
<br />8,508
<br />[41
<br />29
<br />5.0
<br />0.06
<br />1.00
<br />660
<br />BUILDING TOTAL
<br />835
<br />MECHANICAL SCOPE OF WORK:
<br />TAP EXISTING DUCT SERVED BY EXISTING PACKAGE UNIT ON ROOF AHU-5
<br />RUN NEW SUPPLY DUCT TO CONTROL ROOM AS SHOWN ON PLANS
<br />CONNECT NEW SUPPLY DUCT TO TWO NEW SUPPLY GRILLES IN CONTROL ROOM
<br />INSTALL NEW RETURN GRILLE AND RETURN AIR CANOPIES IN CONTROL ROOM
<br />REBALANCE SYSTEM TO REQUIRED OUTSIDE AIR REQUIREMENTS
<br />EXISTING COOUNG CAPACITY TO REMAIN UNCHANGED AND REDISTRIBUTED ACCORDINGLY.
<br />CONTROL SCOPE OF WORK:
<br />EXISTING CONTROLS TO REMAIN
<br />PROIF(T ('Of)F CIIWWAPY
<br />TRADE I CATEGORY
<br />BCD CRITERIA INPUT
<br />SOURCE I ADDITIONAL SOURCE INFO (DATE, MEETING, E-MAIL,ETC)
<br />CODE BASIS FOR PROJECT
<br />MECHANICAL
<br />MECHANICAL CODE
<br />2018 WASHINGTON MECHANICAL CODE
<br />AM
<br />EFFECTIVE FEB 1ST 2021
<br />MECHANICAL
<br />FIRE CODE
<br />2018 INTERNATIONAL ARE CODE WITH STATE AND LOCAL AMMENDMENTS
<br />AEU
<br />EFFECTIVE FEB 1ST 2021
<br />MECHANICAL
<br />PLUMBING CODE
<br />2018 UNIFORM PLUMBING CODE WITH STATE AND LOCAL AMMENDMENTS
<br />AND
<br />EFFECTIVE FEB 1ST 2021
<br />MECHANICAL
<br />ENERGY CODE
<br />2018 WASHINGTON STATE ENERGY CODE WITH LOCAL AMMENDMENTS
<br />AHJ
<br />EFFECTIVE FEB 1ST 2021
<br />MECHANICAL
<br />BUILDING CODE
<br />2018 INTERNATIONAL BUILDING CODE (IBC)
<br />AM
<br />EFFECTIVE FEB 1ST 2021
<br />MECHANICAL
<br />ELECTRICAL CODE
<br />12017 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS
<br />AM
<br />DUCT INSULATION SCHEDULE
<br />DUCT TYPE [2]
<br />LOCATION
<br />CLIMATE ZONE
<br />TEMP RANGE
<br />(DEGREES F)
<br />INSULATION R-VALUE
<br />REQUIREMENT
<br />INSULATION TYPE
<br />SUPPLY AIR [1,3]
<br />WITHIN CONDITIONED SPACE WHERE THE DUCT CONVEYS AIR THAT
<br />IS 55 F OR GREATER; AND 105 F OR LESS
<br />4C
<br />55-105
<br />NONE
<br />NA
<br />COMPLIANT WITH 2O18 WA STATE ENERGY CODE, COMMERCIAL PROVISIONS WSEC WITH UPDATES THROUGH 2O21.
<br />NUILJ:
<br />I. INSULATION NOT REQUIRED FOR DUCTWORK WITHIN EQUIPMENT.
<br />2. INSULATION FOR SHEET METAL PLENUMS SHALL BE THE SAME AS INDICATED FOR DUCTS. REFER TO OUTSIDE AIR, SUPPLY, RETURN, OR EXHAUST FOR SERVICE APPLICATION.
<br />3. PROVIDE VAPOR -RETARDER MASTIC ON SUPPLY AIR AND OUTSIDE AIR DUCTS AND PLENUMS.
<br />4. RETURN AIR PLENUMS WITH PERMANENT OPENINGS TO CONDITIONED SPACE ARE CONSIDERED CONDITIONED SPACE.
<br />5. PROVIDE FSK INSULATION FOR DUCTS AND PLENUMS, EXCEPT PROVIDE FSK INSULATION WITH WEATHERPROOF ALUMINUM JACKET FOR DUCTS OUTSIDE THE BUILDING.
<br />[11 OCCUPANI UL%JIY AND VENIILAIIUN HAILS PEH ZU]B IMC AND WSMC TABLE 403.5
<br />[2] BREATHING ZONE OUTDOOR AIR, ASHRAE 62.1 EQUATION 6-1
<br />[3] ZONE OUTDOOR AIR, ASHRAE 62.1 EQUATION 6-2
<br />[4] EXCEPTION: THE OCCUPANT LOAD IS NOT REQUIRED TO BE DETERMINED BASED ON THE ESTIMATED MAXIMUM OCCUPANT LOAD RATE INDICATED IN TABLE 403.3.1.1 WHERE APPROVED STATISTICAL DATA DOCUMENT THE ACCURACY OF AN ALTERNATE ANTICIPATED OCCUPANT DENSITY.
<br />AIR HANDLING UNIT SCHEDULE
<br />TAG
<br />I AN- -5
<br />LOCATION
<br />ROOF
<br />EQUIPMENT
<br />MANUFACTURER
<br />TRANE
<br />MODEL
<br />YCD12OC4LOAB
<br />EFFICIENCY EER/IEER
<br />EXISTING
<br />CODE REQUIRED EFFICIENCY EER/IEER
<br />EXISTING
<br />SUPPLY FAN PERFORMANCE
<br />CFM
<br />3,210
<br />ESP
<br />EXISTING
<br />RPM
<br />963.00
<br />HP
<br />3.00
<br />MIN CA
<br />835
<br />COOLING PERFORMANCE
<br />TOTAL MEIN
<br />EXISTING
<br />SENSIBLE MET
<br />EXISTING
<br />EDB (DEG F)
<br />EXISTING
<br />EWB (DEC F)
<br />EXISTING
<br />OSA (DEG F)
<br />EXISTING
<br />HEATING PERFORMANCE
<br />TOTAL MEIN
<br />EXISTING
<br />EDB (DEG F)
<br />EXISTING
<br />WEI (DEG 0
<br />EXISTING
<br />FILTRATION
<br />TYPE
<br />EXISTING
<br />R EFFICIENCY
<br />EXISTING
<br />ELECTRICAL
<br />RA (AMPS)
<br />EXISTING
<br />COMPRESSOR QUANTITY
<br />EXISTING
<br />MCA
<br />EXISTING
<br />MOP
<br />EXISTING
<br />VOLT
<br />EXISTING
<br />PHASE
<br />EXISTING
<br />SCCR
<br />EXISTING
<br />PHYSICAL
<br />OPERATING WEIGHT (LBS)
<br />EXISTING
<br />LENGTH (IN)
<br />EXISTING
<br />WIDTH (IN)
<br />EXISTING
<br />HEIGHT (IN)
<br />EXISTING
<br />SUPPLY CONNECTION SIZE (IN)
<br />EXISTING
<br />RETURN CONNECTION SIZE (IN)
<br />EXISTING
<br />2018 WSEC COMPLIANCE
<br />I C403.3.2 - HVAC EQUIPMENT SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS OF TABLES C403.3.2(1), C403.3.2(2), C403.3.2(3), C403.32(4),
<br />C403.3.2(5), C403.3.2(6), C403.3.2(7), C403.3.2(8), C403.3.2(9), C403.32(10), C403.3.2(11), AND C403.3.2(12) OF THE WSEC AND AS INDICATED IN
<br />THE CONTRACT DOCUMENTS.
<br />2 WHERE USED TO CONTROL BOTH HEATING AND COOLING, ZONE THERMOSTATIC CONTROLS SHALL PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT
<br />LEAST SF (2.RC) WITHIN WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS CAPABLE OF BEING SHUT OF OR REDUCED TO A
<br />MINIMUM IN ACCORDANCE WITH SECTION C403.4.1.2 OF THE WSEC OR AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES.
<br />3 AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROLS SHALL BE CAPABLE OF STARING AND STOPPING THE SYSTEM FOR SEVEN DIFFERENT DAILY
<br />SCHEDULES PER WEEK AND RETAINING THEIR PROGRAMMING AND TIME SETTING DURING A LOSS OF POWER FOR AT LEAST 10 HOURS. ADDIDONALLY, THE
<br />CONTROLS SHALL HAVE A MANUAL OVERRIDE THAT ALLOWS TEMPORARY OPERATION OF THE SYSTEM FOR UP TO 2 HOURS; A MANUALLY OPERATED TIMER
<br />CAPABLE OF BEING ADJUSTED TO OPERATE THE SYSTEM FOR UP TO 2 HOURS; OR AN OCCUPANCY SENSOR IN ACCORDANCE WITH SECTION C403.4.22 OF
<br />THE WSEC AND DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES.
<br />4 PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTIONS C40822 (HVAC SYSTEMS),
<br />C408.2.2.1 (AIR SYSTEMS), AND C408.2.2.2 (HYDRONIC SYSTEMS) OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS.
<br />5 ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK AND SHALL BE CONSTRUCTED IN ACCORDANCE
<br />WITH THE IMC. ALL DUCTWORK SHALL BE SEALED AND TESTED AS REQUIRED BY SECTIONS C403.10.1 AND C403.102 OF THE WSEC. DUCT TAPE IS
<br />NOT PERMITTED AS A SEALANT ON ANY DUCTS.
<br />DUCTWORK STATIC PRESSURE AND SEAL CLASS
<br />LOW PRESSURE (1/2-2 in wc):
<br />SEAL ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS.
<br />MEDIUM PRESSURE (2-3 IN WC):
<br />SEAL ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS AND DUCT WALL PENETRATIONS
<br />HIGH PRESSURE (3+ IN WC):
<br />SEAL ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS, AND CONNECTIONS OF SUPPLY AND RETURN DUCTS AND DUCT WALL PENETRATIONS. IN
<br />ADDITION, DUCTS AND PLENUMS SHALL BE LEAK -TESTED IN ACCORDANCE WITH THE SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL WITH THE RATE OF
<br />AIR LEAKAGE (CIF) LESS THAN OR EQUAL TO 4.0 AS DETERMINED IN ACCORDANCE WITH EQUATION 4-9.
<br />6 ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION C403.10.1.2 OF THE WSEC AND AS DESCRIBED IN THE PROJECT MANUAL.
<br />7 WSEC C403.10.3 - ALL PIPING SERVING AS PART OF A HEATING OR COOLING SYSTEM SHALL BE THERMALLY INSULATED IN ACCORDANCE WITH TABLE
<br />C403.10.3 OF THE WSEC AND AS DESCRIBED IN THE PROJECT MANUAL.
<br />8 FOR ALL OCCUPANCIES OTHER THAN GROUP R, EACH ZONE SHALL BE PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY
<br />EITHER AN AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROL SYSTEM IN ACCORDANCE WITH SECTION C403.4.2
<br />9 SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS REQUIRED IN SECTION C403.6.4 (AIR) AND C403.4.4 (WATER) OF THE WSEC
<br />AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES.
<br />10 WSEC C403.5 - EACH COOLING SYSTEM THAT HAS A FAN SHALL INCLUDE AN AIR ECONOMIZER MEETING THE REQUIREMENTS OF SECTIONS C403.5.1
<br />THROUGH C403.5.5
<br />11 ECONOMIZER SYSTEMS SHALL BE INTEGRATED WITH THE MECHANICAL COOLING SYSTEM AND BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN WHERE
<br />ADDITIONAL MECHANICAL COOUNG IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD IN ACCORDANCE WITH SECTION C403.5.1 OF THE WSEC.
<br />12 WATER ECONOMIZER SYSTEMS SHALL BE CAPABLE OF COOLING SUPPLY AIR BY INDIRECT EVAPORATION AND PROVIDING UP TO 100 PERCENT OF THE
<br />EXPECTED SYSTEM COOLING LOAD AT OUTDOOR AIR TEMPERATURES OF NOT GREATER THAN 50-DEG F D13/45 DG-F WET BULB IN ACCORDANCE WITH
<br />SECTION C403.5.4.1 OF THE WSEC.
<br />13 SIMULTANEOUS HEATING AND COOLING TO INDIVIDUAL ZONES SHALL BE PROHIBITED AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES EXCEPT
<br />WHERE PERMITTED IN SECTION C403.4.1 OF THE WSEC.
<br />14 VARNBIE FREQUENCY DRIVES SHALL BE PROVIDED FOR VARIABLE FLOW HEATING AND AIR HANDLING SYSTEMS AS REQUIRED BY SECTION C403.2.3 OF THE
<br />WSEC AND AS DESCRIBED IN THE CONTRACT DOCUMENTS INCLUDING TEMPERATURE CONTROL SEQUENCES.
<br />15 ELECTRIC WATER HEATERS IN UNCONDITIONED SPACES OR ON CONCRETE FLOORS SHALL BE PLACED ON AN INCOMPRESSIBLE, INSULATED SURFACE WITH A
<br />MINIMUM THERMAL RESISTANCE OF R-10 IN ACCORDANCE WITH SECTION C404.5 OF THE WSEC.
<br />16 WSEC C404.7 - CIRCULATING HOT WATER SYSTEM PUMPS SHALL BE CONTROLLED IN ACCORDANCE WITH SECTION C404.7.1 OF THE WSEC. HEAT TRACE
<br />TEMPERATURE SYSTEMS SHALL BE CONTROLLED IN ACCORDANCE WITH SECTION C404.7.2 OF THE WSEC. HOT WATER STORAGE SYSTEM PUMPS SHALL BE
<br />CONTROLLED IN ACCORDANCE WITH SECTION C404.7.3 OF THE WSEC.
<br />17 ELECTRIC MOTOR EFFICIENCY SHALL COMPLY WITH SECTION C405.8 AND SHALL NOT BE LESS THAN THE CORRESPONDING VALUES FOR ENERGY EFFICIENT
<br />MOTORS PROVIDED IN TABLES C405.8(1) THROUGH C405.8(4) OF THE WSEC WHEN TESTED AND RATED IN ACCORDANCE WITH DOE 10 CAR.
<br />18 RECORD DOCUMENTS SHALL BE PROVIDED TO THE OWNER AS REQUIRED BY SECTION C103.6.1 OF THE WSEC. CONSTRUCTION DOCUMENTS SHALL BE
<br />UPDATED TO CONVEY A RECORD OF THE ALTERATIONS TO THE ORIGINAL DESIGN. SUCH UPDATES SHALL INCLUDE UPDATED MECHANICAL, PLUMBING, AND
<br />CONTROL DRAWINGS THAT SHOW All CHANGES TO SIZE, TYPE AND LOCATIONS OF COMPONENTS, EQUIPMENT AND ASSEMBLIES.
<br />19 OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AND INCLUDE ALL OF THE FOLLOWING PER SECTION C103.6.2 OF THE WSEC.
<br />1. SUBMITTAL DATA
<br />2. OPERATION AND MAINTENANCE DATA FOR EQUIPMENT
<br />3. NAME AND ADDRESS OF AT LEAST ONE SERVICE AGENCY
<br />4. HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION
<br />5. A NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. S.O.O. IS NOT ACCEPTABLE FOR THIS REQUIREMENT.
<br />20 HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION C408.2.2 OF THE WSEC.
<br />21 A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS 'ANAL COMMISSIONING REPORT" SHALL BE DELIVERED TO THE BUILDING OWNER AS
<br />REQUIRED BY SECTION C408.1.3 AND SHALL INCLUDE:
<br />1. RESULTS OF FUNCTIONAL PERFORMANCE TESTS.
<br />2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING, INCLUDING DETAILS OF CORRECTIVE MEASURES USED OR PROPOSED.
<br />3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONING PROCESS INCLUDING MEASURABLE
<br />CRITERIA FOR TEST ACCEPTANCE, PROVIDED HEREIN FOR REPEATABILITY.
<br />4. COMMISSIONING PLAN
<br />5, TESTING, ADJUSTING, AND BALANCING REPORT
<br />F-
<br />a
<br />N �Zi aaaaaaa�
<br />G
<br />J
<br />o
<br />Cl)
<br />O
<br />Z
<br />Go
<br />E
<br />Q
<br />rn
<br />V
<br />i3
<br />Z
<br />F-
<br />O
<br />N F-
<br />n �
<br />J
<br />4A W
<br />`
<br />O
<br />W
<br />>
<br />p W 3
<br />zLL .U)J
<br />S2O wxa
<br />N W> F~N2
<br />-J ww Q¢ONf a
<br />D xaO�z»aO
<br />0 102 O¢002
<br />Lu p aUrW
<br />U Oxw6m0 ZiR
<br />cn 3Q�ooZFoFo
<br />J 2a W <o V �zfgQ
<br />Q oWWaFcz ww.Wls
<br />U - Mx>zw'Oar>z
<br />Ywz Om¢wm2o
<br />Q °' Fx 7 o D0_mU
<br />= J
<br />U
<br />CW
<br />L
<br />U
<br />Z
<br />Q
<br />N
<br />W
<br />F--
<br />0
<br />Z
<br />E
<br />o
<br />Lu
<br />W U
<br />Z !_
<br />W
<br />7
<br />Z
<br />_O
<br />Q
<br />J
<br />U
<br />J
<br />Q
<br />U
<br />Drawn By UMC
<br />Checked By RK
<br />Original Issue Date 05/19/2023
<br />Job No. 9038
<br />Scale AS SHOWN
<br />Sheet No.
<br />M0.02
<br />
|