My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 10/10/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
BHC Consultants 10/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 9:36:27 AM
Creation date
10/10/2023 9:35:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
10/10/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Sabrina Good
Subject / Project Title
Building and Structural Plan Review
Tracking Number
0003975
Total Compensation
$45,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />1.4 On-call and other services will be provided as desired by the City and agreed upon by BHC on a <br />time-and-expense basis using an hourly rate identified in the Hourly Labor Rates Schedule. <br /> <br />2. HOURLY ASSIGNMENTS. Upon receiving a plan review task by the City, BHC and the City will <br />determine the maximum allowed hours to be utilized for the complete review of the task. If, after <br />starting the initial review, it is determined by BHC that the maximum hours required to complete the <br />task exceed the initial estimate, BHC will not proceed with the review until the City has considered <br />and either authorizes additional hours or determines that BHC has completed the review to the City’s <br />satisfaction. <br />HOURLY LABOR RATES SCHEDULE <br /> <br /> <br />Classification Hourly Rates <br /> <br />Plan Checker I (hourly charges) $140 <br />Plan Reviewer II - Structural $210 <br />Fire Protection (FPE) $150 <br />Fire Protection (non FPE, fire plan review certified) $120 <br />Civil/site plan review (P.E.) $150 <br /> <br />Overtime Services 150% of Above Rates Shown <br />(No overtime will be charged without <br />prior authorization by the City.) <br /> <br />These rates are effective from January 1, 2023 through December 31, 2023 <br />Rates will be reviewed and considered for adjustment on an annual basis. Any proposed adjustment to the <br />fees will be negotiated between BHC and the client. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.