Laserfiche WebLink
Existing (2) stud <br />post <br />Existing Main floor <br />framing <br />Existing concrete <br />foundation <br />Okay to bend the <br />MST48 strap by 1/2" <br />so that it runs flush <br />on the sheathing and <br />concrete <br />D1 <br />Existing (2) stud <br />post <br />Existing concrete <br />foundation <br />D3 <br />Stra <br />MST48 hold down to <br />replace HDU2 per plan. <br />Provide (15) 0.162x2- <br />1/2 nails to wood studs. <br />Existing deck. Remove 4" <br />segment of ledger to allow <br />6„ strap to pass through. <br />5 1/4" <br />(2)1/2"x4" Titen <br />Anchor <br />Strap Hold Down Detail 1 <br />3/4" = 1'-0" <br />MST36 hold down to <br />replace HDU2 per plan. <br />Provide (15) 0.162x2- <br />1/2 nails to wood studs. <br />5 1/2" <br />(2)1 /2"x4" Titen HD <br />anchors <br />Hold Down Detail 3 <br />3/4" = 1'-0" <br />Existing (2) stud <br />post <br />Existing main floor <br />framing <br />Existing (2) stud <br />post <br />D2 <br />(2) CS16 strap, (11) <br />0.148x2-1/2 nails <br />each end of each <br />strap <br />13" <br />Strap Hold Down Detail 2 <br />3/4" = 1'-0" <br />U) <br />U U) <br />E <br />W 0 <br />nrn <br />rn m <br />0.5 <br />N N <br />N N � ar) <br />'m <br />L � � <br />3 z O U <br />�@ <br />� 0 <br />nt-C-C <br />a .o <br />r:;� CU <br />S� E <br />C(o <br />0 <br />j <br />t� <br />�O <br />�o <br />a�C0,0 <br />�o <br />L <br />M <br />N <br />N W <br />W <br />ions: <br />4/23 <br />S1 <br />