Laserfiche WebLink
INSPECTION REPORT <br /> _,� Date_ _Is_ Permit: _ 1 SOr _bb <br /> i <br /> Contractor: <br /> Owner: <br /> Site Address: ____I_D 1 S4 Z ____eJ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL B ILDING MECHANICAL PLUMBING <br /> ❑Temp Service :-UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork citing ❑Rough In p Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final p HWT Final <br /> OT R OR CONSULTATION: <br /> 4APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ CORRECTION REQUESTED FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. <br /> ❑ OK FOR C.O. ❑ VIOLATION 1:1 <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Or 7L0 i w kr <br /> Inspector: Date: li v <br /> EIR(10/06) DATABAR,INC. <br />