My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS ................................ 225 <br />9-05.12 Polyvinyl Chloride (PVC) Pipe ........................................................... 225 <br />9-05.13 Ductile Iron Sewer Pipe ..................................................................... 225 <br />9-05.15 Metal Castings ................................................................................... 226 <br />9-05.23 High Density Polyethylene (HDPE) Pipe ............................................ 226 <br />9-05.24 Polypropylene Sewer Pipe ................................................................. 227 <br />9-05.32 Insertion Tee (******) ......................................................................... 227 <br />9-05.64 Polypropylene Manhole and Hand Hold Steps (******) ...................... 227 <br />9-05.66 Polypropylene Manhole Ladder (******) ............................................. 227 <br />9-14 EROSION CONTROL AND ROADSIDE PLANTING ............................................ 227 <br />9-14.1 Soils .................................................................................................. 227 <br />9-14.6 Plant Materials ................................................................................... 228 <br />9-23 CONCRETE CURING MATERIALS AND ADMIXTURES ..................................... 228 <br />9-23.2 Liquid Membrane-Forming Concrete Curing Compounds .................. 228 <br />9-23.6 Chemical Admixtures for Concrete .................................................... 228 <br /> <br /> <br />APPENDIX A – GEOTECHNICAL ENGINEERING INVESTIGATION <br />APPENDIX B – COE STANDARD DRAWINGS <br />APPENDIX C – CHANGE ORDER FORMS <br />APPENDIX D – PUGET SOUND CLEAN AIR AGENCY – EXCERPTS OF AIR QUALITY <br />RULES <br />APPENDIX E – INADVERTENT DISCOVERY PLAN <br />APPENDIX F – CONSTRUCTION STORMWATER SITE INSPECTION FORM <br />APPENDIX G – INDUSTRIAL DISCHARGE APPROVAL REQUEST FORM <br />APPENDIX H – STORMWATER FACILITY SPECIFICATION INSERT <br />APPENDIX I – PREVAILING WAGE RATES <br />APPENDIX J – NOISE CONTROL ORDINANCE <br />APPENDIX K – CONSTRUCTION EASEMENTS
The URL can be used to link to this page
Your browser does not support the video tag.