My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 12 <br /> <br /> <br />DIVISION P - PROPOSAL <br />CITY OF EVERETT, WASHINGTON <br />BEVERLY LAKE WATER QUALITY RETROFIT <br />WORK ORDER # UP3745 <br /> <br />To the City Council <br />Everett, Washington <br /> <br /> <br /> <br /> <br />The undersigned Bidder declares that it has carefully examined the Notice to Contractors and the <br />Contract Documents (including without limitation Plans and Specifications, Standard Specifications, <br />Special Provisions, Appendix, Proposal, and Contract) for the construction of three stormwater treatment <br />facilities, with associated pipe and structures, and other such Work as may be necessary, in accordance <br />with the Contract. The undersigned Bidder declares that the Bidder has made such investigations as are <br />necessary to determine the conditions to be encountered, and that, if this Proposal is accepted, the <br />undersigned will enter into a contract with the City of Everett, Washington, in the form of Contract <br />hereto annexed, the undersigned will, to the extent required, provide the necessary equipment, tools, <br />apparatus, and other means of construction, and the undersigned will furnish all labor and materials <br />necessary to complete the Work in the manner herein specified and according to the requirements of the <br />Engineer. <br /> <br />The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br />on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br />of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any purchase <br />of or sale of any materials or supplies for the Work to which it relates, or any portion of the profits <br />thereof. <br /> <br />The undersigned Bidder agrees that the undersigned will complete the Work in all respects as required <br />by Division C, Section 2. Contract Time and that the Bidder will pay liquidated damages to the City <br />in the amount specified in the Contract Documents. <br /> <br />Accompanying this Proposal is a bid bond or certified check or cashier’s check in the amount of five <br />percent (5%) of the Proposal according to the conditions of the “Notice to Contractors” and “Division 1 <br />- General Requirements” hereby incorporated. If this Proposal shall be accepted by the City of Everett, <br />Washington, and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the <br />Division 1 – General Requirements hereto incorporated, within 14 calendar days after the Award Date, <br />then the City may, at its option, determine that the undersigned has abandoned the Contract and the <br />amount of the bid bond or certified check or cashier’s check accompanying this Proposal shall be <br />forfeited and become the property of the City of Everett, Washington. <br />
The URL can be used to link to this page
Your browser does not support the video tag.